Keyword: project management

Found 427 papers in total
The discrete time–cost tradeoff problem revisited
1995,
In the management of a project, the project duration can often be compressed by...
Activity nets: A guided tour through some recent developments
1995,
The first papers on activity nets (under the names of the CPM and PERT) appeared in...
The component retrieval problem in printed circuit board assembly
1996,
Minimization of the makespan of a printed circuit board assembly process is a complex...
Can software risk management improve system development: An exploratory study
1997,
Software risk management can be defined as an attempt to formalise risk oriented...
A local constraint based analysis approach to project scheduling under general resource constraints
1994,
In the doubly-constrained project scheduling problem where nonrenewable resources are...
Towards a new planning and scheduling approach for multistage production systems
1997,
Some specific industries (electronic equipment, armament, aeronautics) suffer from...
On-line control model for network construction projects
1997,
An activity-on-arc network project of the PERT type with random activity durations is...
An investigation into the relationship of heuristic performance with network-resource characteristics
1997,
Constrained resources project management heuristics are analyzed and their performance...
Contracting for 21st century infrastructure
1996,
Contracting practice and theory is based upon a legal framework which impedes the...
Efficient priority rules for the resource-constrained project scheduling problem
1996,
Resource-constrained project scheduling is a core problem for many industrial...
An iterative local constraint based analysis for solving the resource constrained project scheduling problem
1996,
In this paper, a new heuristic iterative scheduling approach is proposed for the...
R&D project selection: A decision process approach
1996,
The fundamental decision problem of an R&D firm is to select projects in which to...
Project segmentation-A tool for project management
1997,
Since the late 1950s network-based techniques are commonly used for project...
Fuzzy priority heuristics for project scheduling
1996,
This paper presents a generalization of the known priority heuristic method for...
Identifying critical activities in stochastic resource constrained networks
1996,
The analysis of the stochastic project network can provide indications of both the...
A fuzzy logic approach for determining expected values: A project management application
1996,
This paper presents a methodology rooted in the general concepts of fuzzy logic theory...
Search heuristics for resource constrained project scheduling
1996,
The paper develops a search procedure for project scheduling problems with multiple...
Critical path analysis with a spreadsheet
1996,
A spreadsheet can serve as a Swiss army knife to the busy manager, providing a quick...
Project management duration/resource tradeoff analysis: An application of the Cut Search Approach
1996,
The paper presents an application oriented procedure for solving the project...
Graphical/statistical approach to repair limit replacement problem
1996,
The total time on test (TTT) concept has proved to be a very useful tool in many...
What are PERT estimates?
1995,
This paper questions what network parameter-estimates really are. This follows recent...
Petroleum pipeline construction planning: A conceptual framework
1996,
A cross-country pipeline construction project is exposed to an uncertain environment...
Empirically assessing the impact of business process reengineering on manufacturing firms
1996,
While the BPR (Business Process Reengineering) concept is conceptually appealing, in...
Application of fuzzy distributions on project management
1995,
PERT/cost which is an extension of PERT to include economic considerations brings cost...