Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: project management
Found
427 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
A knowledge-based system for identifying potential project risks
1998,
Tummala V.M. Rao
This paper presents an integrated knowledge-based system (KBS) that assists project...
Network Scheduling for Construction Project Management
1999,
Simister S.
A new algorithm for preparing PERT networks
1998,
Sharma R.R.K.
Activity on node (AON) and activity on arrow (AOA) network are widely used for...
Assessing and managing important risks
1999,
Ward S.C.
A common problem in project risk management processes is the need to determine the...
A fuzzy set approach to activity scheduling for product development
1999,
Wang J.R.
Industries need to effectively manage their product development processes to reduce...
A model of systems and projects (Part I)
1997,
Korczyski Waldemar
Modelling of systems and projects by various types of nets is a good tool to deal with...
On some transformations of net-like models of systems and projects (Part II)
1997,
Korczyski Waldemar
In the first part of the paper the notion of a graph with limitations has been...
A metaheuristic scheduling procedure for resource-constrained projects with cash flows
1999,
Padman Rema
Resource-constrained project scheduling problems with cash flows (RCPSPCF) are...
Performance evaluation of general and company specific models in software development effort estimation
1999,
Wassenhove Luk van
In this paper we present the results of our effort estimation analysis of a European...
Application of sensitivity analysis in investment project evaluation under uncertainty and risk
1999,
Jovanovic Petar
This paper treats investment decision-making under uncertainty and risk. Some of the...
Applying a risk management process to manage cost risk for an EHV transmission line project
1999,
Tummala V.M. Rao
Risk management processes (RMPs) are logically consistent and structured approaches to...
Ship maintenance scheduling by genetic algorithm and constraint-based reasoning
1999,
Ohta Hiroshi
Ship maintenance scheduling is a process to decide start times of maintenance...
Scheduling of design projects with uncertain number of iterations
1999,
Luh Peter B.
A short product design cycle is critical to the success of companies in the era of...
Scheduling of resource tasks
1999,
Ecker Klaus H.
In many applications e.g. from operations research, or areas like operating system, in...
A multiobjective linear program for scheduling repetitive projects
1997,
Al-Subhi Al-Harbi Kamal
This article is focused on a programming method related to a repetitive project or, in...
Modeling ordered decision making in product development
1998,
Krishnan Viswanathan
This paper models the process of ordered product design decision making and shows that...
Optimal resource leveling using implicit enumeration
1998,
Csbfalvi Gyrgy
This paper presents a new exact approach for resource leveling based on implicit...
Construction process improvement methodology for construction projects
1998,
Serpell Alfredo
A methodology developed for construction improvement and waste reduction is presented....
The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects
1998,
Chapman Robert J.
Within the construction industry the combination of an increasingly fragmented design...
Project logistics: Integrating the procurement and construction processes
1998,
Caron F.
The paper presents a stochastic model to plan the delivery of material to a building...
Optimal operation grouping and sequencing technique for multistage machining systems
1998,
Suh H.-W.
In this study, the problem of determining the optimal group and sequence of operations...
Analysis for performance and reliability of fault tolerant parallel software
1998,
Sugino Eiji
The authors have proposed a method converting parallel programs to construct...
Project Risk Management: Processes, Techniques and Insights
1998,
Smith J.U.M.
New computational results on the discrete time/cost trade-off problem in project networks
1998,
Demeulemeester E.
We describe a new exact procedure for the discrete time/cost trade-off problem in...
First Page
11
12
13
14
15
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers