Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: United Kingdom
Found
17295 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Topological design of ring networks
1994,
Altinkemer Kemal
In this paper the shortcomings of conventional ring networks are discussed and how...
An envelope function model for forecasting athletics records
1994,
Dargahi-Noubary G.R.
The purpose of this paper is to present a multiplicative model for the fastest time...
Base stock level determination for high cost low demand critical repairable spares
1994,
Schmidt Charles P.
The paper presents an ( S-1,S) policy with three modes of replenishment: normal repair...
An efficient approach to real-time traffic routeing for telephone network management
1994,
Chang C.-Y.
When contingencies occur in the telephone network the proper traffic control actions...
The single most vital arc in the most economical path problem-A parametric analysis
1994,
Chern Maw-Sheng
For a network with two specified nodes, an arc is called a single most vital arc in...
Monitoring the performance of a reorder point system: A control chart approach
1994,
Hahn Chan K.
In order to ensure that an inventory system is performing correctly, management must...
Implementing Larson and Sadiq’s location model in a geographic information system
1994,
Batta Rajan
Larson and Sadiq developed and analyzed a model for locating facilities on a Manhattan...
A linear goal programming model for trans-shipment problems with flexible supply and demand constraints
1994,
Kwak N.K.
This paper deals with the development of a linear goal programming model for solving...
Organisational structure and purchasing linkage patterns of manufacturing firms in developing countries: Small- and medium-scale firms in Metropolitan Colombo, Sri Lanka
1986,
Dias S.
In this paper the pattern of purchasing linkages and their relationships with...
Implementing advanced manufacturing technology: An integrated planning model
1994,
Chen I.J.
Investment in advanced manufacturing technologies (AMT) remains a promising but...
A queueing network model for field service support systems
1994,
Waller A.A.W.
This paper combines research in the area of computer systems performance modeling with...
Monitoring and diagnosis systems: New components of production planning and control-Methodologies, applications and experience
1994,
Wiendahl H-P.
Traditional performance measurement in job shop production disregards the new...
Development of operator assignment schedules: A DSS approach
1994,
Turner C.F.
Being able to generate an operator assignment schedule for a ( m) multi-stage, ( n)...
A new global approach for 0-1 polynomial programs
1994,
Li Han-Lin
Given a polynomial expression where and are variables, the famous Glover and Woolsey...
A make-or-buy decision analysis involving imprecise data
1994,
Naadimuthu G.
The make-or-buy decision has been performed on the assumption that cost data are...
Data for project risk analyses
1994,
Bowers John A.
Numerous techniques are available for the quantitative analysis of project risk, but...
Using a risk register to integrate risk management in project definition
1994,
Williams Terry M.
Risk analysis and management forms a vital part of the early stages of a project, and,...
Planning for project control through risk analysis: A petroleum pipeline-laying project
1994,
Dey Prasanta
Projects that are exposed to uncertain environments can be effectively controlled with...
Some necessary and sufficient conditions for age replacement with non-zero downtimes
1994,
Dagpunar J.S.
This paper considers an age replacement strategy, where downtimes are non-zero....
Who goes where?
1994,
Erikson S.E.
In 1996 a large urban based organisation will consolidate its corporate workforce from...
Simultaneous scheduling of machines and automated guided vehicles
1993,
Ulusoy G.
This paper is an attempt to make scheduling of AGVs an integral part of the overall...
A Finch-Foster duality between ‘pull’ and ‘push’ production systems
1994,
Siha S.
This paper views ‘push’ and ‘pull’ production systems as...
Jobs and tool sequencing in an automated manufacturing environment
1993,
Chandra P.
A practical approach is presented for determining the sequence of jobs and tools in...
Scheduling in a cellular manufacturing system: A simulated annealing approach
1993,
Rajendran C.
The problem of scheduling in a cellular manufacturing system is considered with the...
First Page
604
605
606
607
608
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers