Article ID: | iaor19941461 |
Country: | United Kingdom |
Volume: | 31 |
Issue: | 12 |
Start Page Number: | 2927 |
End Page Number: | 2945 |
Publication Date: | Dec 1993 |
Journal: | International Journal of Production Research |
Authors: | Rajendran C., Sridhar J. |
Keywords: | optimization: simulated annealing |
The problem of scheduling in a cellular manufacturing system is considered with the objective of minimizing the sum of completion times (or total flow time) of jobs. A correct formulation of recursive equation for the flowline-based cellular manufacturing system is first proposed. Subsequently a heuristic is developed to obtain a sequence that minimizes total flow time in a flowline cell. The proposed heuristic makes use of the simulated annealing technique and is developed in two stages. A good initial heuristic seed sequence obtained in the first stage is improved upon by a proposed new variant of the simulated annealing technique wherein three different perturbation schemes have been experimented with. One of the perturbation schemes is newly proposed in this paper and is called the