Development of operator assignment schedules: A DSS approach

Development of operator assignment schedules: A DSS approach

0.00 Avg rating0 Votes
Article ID: iaor19942174
Country: United Kingdom
Volume: 22
Issue: 1
Start Page Number: 57
End Page Number: 67
Publication Date: Jan 1994
Journal: OMEGA
Authors: , ,
Keywords: programming: dynamic
Abstract:

Being able to generate an operator assignment schedule for a (m) multi-stage, (n) operator production line, with n less or equal to m, and with multiple objectives, is a problem which continues to exist both in the literature and in practice. This paper illustrates how weighted backward dynamic programming and simulation can be combined in a decision support system (DSS) to address such a problem and to evaluate the characteristics of a dynamic production line.

Reviews

Required fields are marked *. Your email address will not be published.