Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: United Kingdom
Found
17295 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Analysis of the time-varying pricing of a bottleneck with elastic demand using optimal control theory
1997,
Yang Hai
In this paper, a time-varying pricing model of a road bottleneck with elastic traffic...
Stability analysis of the classical car-following model
1997,
Zhang Xiaoyan
This paper investigates the stability of the classical car-following model. Conditions...
Formulating a methodology for modelling revealed preference discrete choice data – the selectively replicated logit estimation
1997,
Caldas Marco A.F.
There are a number of studies on modelling with Revealed Preference (RP) data. It is a...
A continuum model for the dispersion of traffic on two-lane roads
1997,
Holland Edward N.
A continuum model for two-lane traffic flow is developed using the theory of kinematic...
Estimation of time-dependent origin–destination matrices for transit networks
1998,
Wong S.C.
In this paper, the estimation of time-dependent origin–destination (O–D)...
Boundary defect recognition using neural networks
1997,
Kim T.
This research presents schemes for automated visual inspection for boundary defects...
Optimization in Industry 3
1997,
Simons Robert
Markov Decision Processes: Discrete Stochastic Dynamic Programming
1997,
van der Duyn Schouten Frank
Dynamic Programming and Optimal Control (2 Volumes)
1997,
Archibald Thomas
Resource scheduling
1997,
Gordon J.
It has been apparent to the authors that a new generation of software writers is...
Measuring uncertainty and criticality in network planning by PERT-path technique
1997,
Mummolo Giovanni
The use of uncertainty and criticality measures in network planning of engineering...
A neural network application to subcontractor rating in construction firms
1998,
Albino Vito
In construction companies, subcontractor rating, due to its intrinsic ambiguity and...
Timing of control activities in project planning
1998,
Macchiaroli Roberto
This paper deals with the timing of monitoring and control in project planning. The...
An uncertainty importance measure of activities in PERT networks
1997,
Cho J.G.
In a PERT network, the importance of each activity needs to be assessed in order to...
Mathematics of Dependable Systems
1997,
Bloomfield Robin
Effective analysis and planning of R&D states: A simulation approach
1997,
Badri Masood A.
Clearly, with the excessive number of R&D project failures and the large amounts...
Stochastic Programming
1996,
Archibald Thomas
Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells
1997,
Rahimifard S.
The planning and scheduling of flexible machining cells is a problem of well-known...
A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
1997,
Aigbedo H.
The sequencing of products for final assembly in JIT mixed-model manufacturing systems...
Maximum principle-based methods for production scheduling with partially sequence-dependent setups
1997,
Maimon O.
This paper introduces a continuous-time optimal control approach to cope with...
Simple priority rule combinations. An approach to improve both flow time and tardiness
1997,
Barman S.
Prior research indicates that no single priority rule displays superior performance on...
Organization determinants of time-based strategies and tactics
1997,
Hendrick Thomas E.
Firms have shifted their competitive emphasis from quality in the 1980s to time in the...
A modified quasi-Newton method for optimization in simulation
1997,
Kao Chiang
Optimization in Simulation is an important problem often encountered in system...
A max-algebra approach to the robust distributed control of repetitive AGV systems
1997,
Zaremba M.B.
This paper presents a new approach for distributed control of automatic guided vehicle...
First Page
494
495
496
497
498
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers