Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Found
97029 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
A branch and bound algorithm for a single item nonconvex dynamic lot sizing problem with capacity constraints
1990,
Erenguc S. Selcuk
The authors develop a branch and bound algorithm for solving a deterministic single item nonconvex dynamic...
Economic engineering in project economy
1988,
Saponaro Paola
This paper faces the problem of project’s economy, purposing several operational models. Some of...
Operations Research in project management and cost engineering: An outlook for new operational developments
1989,
Poiaga Luigi
Once the content of the recent disciplines of project management and cost engineering is defined, the...
Time-costs interaction for large projects control
1989,
Poiaga Luigi
The author deals with the problem of time-costs interaction in large projects and all its implications and...
A zero-one goal programming approach for information system project selection
1989,
Schniderjans M.
This paper presents a multi-objective model that can be used to help information systems (IS) managers...
Scheduling tasks with failure probabilities to minimize expected cost
1990,
Henig Mordechai I.
A project is made of several tasks which can be executed in parallel. Each task is associated with...
Failure free warranty policies for non-repairable products: A review and some extensions
1988,
Nguyen D.G.
This paper reviews failure free warranty policies for non-repairable products and examines some extensions...
Asymptotic analysis of some complex renewable systems operating in random environments
1989,
Sztrik Jnos
The present paper is concerned with an asymptotic analysis of some complex renewable systems operating in...
Extensions of the signed domination theorem
1989,
Iyer Srinivas
Several generalizations of the signed domination theorem are given. The total amenability of a k- out-of-...
A summary of replacement models with changing failure distributions
1989,
Nakagawa T.
A unit has changing failure distributions for each duration time between events such as fault, use,...
Two-unit system subject to effective random shocks and preventive maintenance
1989,
Al-Ali Abdul Ameer
This paper considers a two-unit system. The operating unit is subject to random shocks and preventive...
Probabilistic analysis of a two unit system with dependent components
1989,
Prasad M.S.
The study of multi-unit repairable stand by systems with independent components has been done by various...
Cost analysis of a one-unit non-repairable system subject to on-line preventive maintenance-IV
1989,
Gopalan M.N.
A study of the cost analysis of a one-unit non-repairable system subject to on-line preventive maintenance...
Reliability analysis of a complex renewable system with fast repair
1989,
Anisimov Vladimir V.
The present paper is concerned with an asymptotic analysis of a complex renewable system operating in...
A new heuristic method for the flow shop sequencing problem
1989,
Widmer Marino
A new heuristic method is presented for solving the m- machine, n- job flow shop scheduling problem. This...
k-optimal solution sets for some polynomially solvable scheduling problems
1989,
Hamacher Horst W.
A k-optimal solution set ¦[ ={S 1 ,..., S k } of a given scheduling problem is a set of schedules...
Improved network based algorithms for the assembly line balancing problem
1989,
Klastorin T.D.
This paper presents two network based algorithms for solving Type I assembly line balancing problems....
Implementing a loading heuristic in a discrete release job shop
1989,
Bobrowski Paul M.
The scheduling literature has developed two almost mutually exclusive problems; a static and a dynamic...
A bottleneck-based beam search for job scheduling in a flexible manufacturing system
1989,
Chang Yih-Long
This paper studies job-scheduling methods for flexible manufacturing systems (FMSs). Routeing flexibility...
Design aspects of an advanced model-oriented DSS for scheduling problems in civil engineering
1989,
Bartusch M.
The paper gives some design features of the architecture of a DSS for scheduling problems under...
Flow shop scheduling with lot streaming
1989,
Baker K.R.
Lot streaming is the process of splitting a job into sublots so that its operations can be overlapped....
Real time scheduling and routing for Flexible Manufacturing Systems with unreliable machines
1989,
Xie Xiaolan
This paper presents a real time scheduling and routing algorithm for a failure prone Flexible...
Simulated annealing for permutation flow-shop scheduling
1989,
Potts C.N.
The problem of scheduling jobs in a flow-shop is considered. The job processing order must be the same on...
A framework for single machine multiple objective sequencing research
1989,
Fry T.D.
The majority of single machine sequencing research has assumed that only one objective is to be minimized....
First Page
3933
3934
3935
3936
3937
Last Page
Papers per page:
8 Papers
16 Papers
24 Papers
32 Papers
48 Papers
Paper Filter
Search Text
Journals
Authors
Keywords
Countries
Year
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Filter It!