Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: personnel & manpower planning
Found
534 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Workforce planning in mixed model assembly systems
1997,
Lee C.Y.
Serial assembly systems are formed by arranging several production cells or stations...
Using linear programming to simulate service engineers
1999,
Powell S.
This paper describes the use of a network flow model to simulate a proposed spatial...
A model for vending machine services in the soft drink industry
1996,
Ong H.L.
This paper deals with the provision of services for vending machines in the soft drink...
Best practice simulated annealing for the airline crew scheduling problem
1999,
Weinert T. Emden
We report about a study of a simulated annealing algorithm for the airline crew...
US Airways optimizes the scheduling of reserve flight crews
1999,
Kontogiorgis Spyros
Reserve pilots and flight attendants work on call to operate flights that the assigned...
Constraint handling in genetic algorithms: The set partitioning problem
1998,
Beasley J.E.
In this paper we present a genetic algorithm-based heuristic for solving the set...
A multiple-shift workforce scheduling model under annualized hours
1999,
Hung Rudy
Many manufacturing and service organizations in Europe have used annualized hours,...
A military reserve manpower planning model
1999,
Reeves Gary R.
A multiple objective model for manpower planning in a company sized, 100 person,...
Modeling and worker motivation in Just In Time production systems
1998,
Thomas L. Joseph
This paper concerns the modeling of low inventory lines. Currently, most models assume...
Return on quality at Chase Manhattan Bank
1999,
Rust Roland T.
A method called ‘return on quality (ROQ)’ has been proposed to evaluate...
An efficient approach to nurse scheduling – implementation for a 2-shift case
1998,
Ikegami Atsuko
This paper deals with the scheduling of nurses to staff shifts at a hospital. The...
Simulated annealing for the multi-objective aircrew rostering problem
1999,
Teodorovi Duan
The aircrew rostering problem entails the assignment of crew members to planned...
A lexi-search algorithm for a time minimizing assignment problem
1998,
Puri M.C.
This paper studies a time minimizing assignment problem (TMAP) also known as the...
Integrated project task and manpower scheduling
1997,
Bailey James E.
The objective of project task scheduling is to determine task start dates and...
Cyclic and non-cyclic scheduling of 12 h shift nurses by network programming
1998,
Millar Harvey H.
In this paper, we present a mathematical model for cyclic and non-cyclic scheduling of...
Demand estimation with failure and capacity constraints: An application to prisons
1997,
Baker Joanna R.
A stochastic model for projecting demand for a population-driven, input–output...
Crew scheduling of light rail transit in Hong Kong: From modeling to implementation
1998,
Chu Sydney C.K.
This work concerns the problem of crew scheduling for the Hong Kong Light Rail Transit...
Aggregate planning models for field service delivery
1997,
Klimberg Ronald K.
A major planning problem for any after-sales repair service operation concerns the...
An efficient two-phase algorithm for cyclic days-off scheduling
1998,
Alfares Hesham K.
An efficient two-phase algorithm is presented for solving the cyclic manpower days-off...
Concurrent engineering of work and production systems
1997,
Stahl Juergen
Concurrent Engineering (CE) is one of the most important concepts for reducing...
The attrition of volunteers
1997,
Degraeve Zeger
We apply a flexible hazard-rate model to analyze the attrition rate of volunteers with...
Crew pairing at Air France
1997,
Soumis Franois
In the airline industry, crew schedules consist of a number of pairings. These are...
Solving large scale crew scheduling problems
1997,
Gelman Eric
The crew pairing problem is posed as a set partitioning zero–one integer...
Optimal staffing for cyclically scheduled processes
1997,
Cochran J.K.
Staffing across multiple time periods with uneven demand is a common problem in many...
First Page
16
17
18
19
20
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers