Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: Management Science
Found
3158 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Misperceiving interactions among complements and substitutes: Organizational consequences
2002,
Siggelkow Nicolaj
Systems composed of activity choices that interact in nonsimple ways can allow firms...
Coordinating mechanisms in care provider groups: Relational coordination as a mediator and input uncertainty as a moderator of performance effects
2002,
Gittell Jody Hoffer
This paper proposes a model of how coordinating mechanisms work, and tests it in the...
Return on assets loss from situational and contingency misfits
2002,
Burton Richard M.
We develop a rule-based contingency misfit model and related hypotheses to test...
Performance of coupled product development activities with a deadline
2001,
Eppinger Steven D.
This paper explores the performance of coupled development activities by proposing a...
What do we know about variance in accounting profitability?
2002,
McGahan Anita M.
In this paper, we analyze the variance of accounting profitability among a broad...
The performance effects of congruence between product competitive strategies and purchasing management design
2002,
David Julie Smith
The objective of this study is to examine a performance contingency effect between...
Contingent labor contracting under demand and supply uncertainty
2001,
Pinker Edieal J.
Firms increasingly use contingent labor to flexibly respond to demand in many...
An optimization model for the simultaneous operational flight and pilot scheduling problem
2001,
Soumis Franois
This paper describes and solves the operational pilot scheduling problem for one day...
Job rotation as a learning mechanism
2001,
Ortega Jaime
This article analyzes the costs and benefits of job rotation as a mechanism with which...
Managerial insights into the effects of interactions on replacing members of a team
2002,
Solow Daniel
A mathematical model is presented for studying the effects of interactions among team...
Human capital and institutional determinants of information technology compensation: Modeling multilevel and cross-level interactions
2002,
Ang Soon
Compensation is critical in attracting and retaining information technology (IT)...
Modelling practical lot-sizing problems as mixed-integer programs
2001,
Wolsey Laurence A.
In spite of the remarkable improvements in the quality of general purpose...
Exchange rates and the choice of ownership structure of production facilities
2001,
Kouvelis Panos
The aim of this research is to study the effects of real exchange rates on the...
Analysis of a forecasting–production–inventory system with stationary demand
2001,
Wein Lawrence M.
We consider a production stage that produces a single item in a make-to-stock manner....
Optimal operating policies for multiplant stochastic manufacturing systems in a changing environment
2001,
Li Lode
This paper addresses the horizontal coordination between production units located in...
A coordinated production planning model with capacity expansion and inventory management
2001,
Rajagopalan Sampath
Motivated by a problem faced by a large manufacturer of a consumer product, we explore...
Make to order or make to stock: Model and application
2002,
Rajagopalan S.
Some firms make all their products to order while others make them to stock. There are...
Managing capacity and inventory jointly in manufacturing systems
2002,
Glynn Peter W.
In this paper, we develop approximations that yield insight into the joint...
Simultaneous capacity and production management of short-life-cycle, produce-to-stock goods under stochastic demand
2002,
Porteus Evan L.
This paper derives the optimal simultaneous capacity and production plan for a...
Process and product improvement in manufacturing systems with correlated stages
2002,
Wright Gordon P.
Manufacturing systems typically contain processing and assembly stages whose output...
Multistage production to order with rework capability
2002,
Gerchak Yigal
This study considers multistage production systems where defective units can be...
Solving multi-item lot-sizing problems with a mixed integer programming solver using classification and reformulation
2002,
Wolsey Laurence A.
Based on research on the polyhedral structure of lot-sizing models over the last 20...
On maximizing the net present value of a project under renewable resource constraints
2001,
Herroelen Willy
In this paper we study the resource-constrained project-scheduling problem with...
On uncertainty, ambiguity, and complexity in project management
2002,
Loch Christoph H.
This article develops a model of a project as a payoff function that depends on the...
First Page
64
65
66
67
68
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers