Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Economics
Found
2380 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Some unsolved problems in data envelopment analysis: A survey
1995,
Olesen O.B.
The present study is a survey of a set of inherent characteristics and unsolved...
Combined heuristics for bi-level group scheduling problems
1995,
Logendran Rasaratnam
In this paper the comparative performance of several combined heuristics for solving...
A simulation study of hypothesis tests for differences in efficiencies
1995,
Banker Rajiv D.
This paper reports the results of a simulation study to evaluate the performance of...
Efficiency measurement of production operations under uncertainty
1995,
Gong Linguo
This paper focuses on the non-parametric efficiency measurement of production...
Incentives and productivity measurements
1995,
Bogetoft Peter
This paper discusses how to evaluate productivity measures from the point of view of...
Non-frontier measures of efficiency, progress and regress for time series data
1995,
Tulkens Henry
In the classical literature on efficiency measurement, the notion of efficiency is...
Linked-cone DEA profit ratios and technical efficiency with application to Illinois coal mines
1995,
Thompson Russell G.
Data Envelopment Analysis (DEA) profit ratios and technical efficiency measures...
Incorporating quality into data envelopment analysis: A stochastic dominance approach
1995,
Olesen O.B.
The study is concerned with the incorporation of information on differences in quality...
Assessing marginal impacts of investments on the performance of organisational units
1995,
Athanassopoulos Antreas D.
This paper develops a data envelopment analysis (DEA) based method for targeting...
Measuring the macroeconomic performance of the Taiwanese economy
1995,
Knox Lovell C.A.
In this paper a scalar-valued summary measure of the macroeconomic performance of an...
Competitive factors and performance measurement: Applying the Theory of Constraints to meet customer needs
1994,
Cox James F.
This article presents an analysis describing how the selection of proper competitive...
The application of an open queueing network to the analysis of cycle time, variability, throughput, inventory and cost in the batch production system of a microelectronics manufacturer
1994,
Miltenburg John
This paper extends the work done in Fromm describing the relationships between...
Approximations for the mean and variance of the throughput of flexible manufacturing cells
1994,
Wilson George R.
A large complex flexible manufacturing system consisting of a number of manufacturing...
A project activity scheduling problem with net present value measure
1994,
Sung C.S.
This paper considers an activity scheduling problem for a project where cash inflows...
The cutting stock problem-A survey
1994,
Cheng T.C.E.
This paper surveys the literature on the cutting stock problem, also known as the...
A model-free power transformation to homoscedasticity
1994,
Ridley Denis
Time series modelling explains most of the variation in color television sales over...
Application of mixed integer programming to a large-scale logistics problem
1994,
Ashayeri J.
Time-based competition has a direct impact on logistics operations. Today, logistics...
Economic analysis of dynamic inventory models with non-stationary costs and demand
1994,
Hariga Moncer A.
With today’s high rate of inflation observed in most world economies, the...
Sensitivity analysis of rent replacement models
1994,
Kobbacy K.A.H.
Rent models are a useful class of replacement models which can be used to study the...
Mathematical models for developing a flexible workforce
1994,
Stewart B.D.
As manufacturers seek ways to stay competitive in world matters, many are discovering...
Allocating work to a two-stage production system with interstage buffer
1994,
Lau Hon-Shiang
Consider a set of discrete tasks whose stochastic task times have specified means and...
Towards a more economic production and just-in-time delivery system
1994,
Zhuang Li
The paper studies a system in which a batch production supplier participates in...
Application of an interactive method for MCILP in project selection decision-A case from Indian coal mining industry
1994,
Mukherjee Kampan
In this paper an attempt is made to develop a methodology for project selection in an...
An efficient algorithm for the single machine tardiness problem
1994,
Kondakci Suna
This study considers the problem of minimizing total tardiness on a single machine. A...
First Page
86
87
88
89
90
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers