Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: Netherlands
Found
18376 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Job oriented production scheduling
1990,
Hastings N.A.J.
This paper describes a system which provides feasible schedules for industrial...
Optimum number of kanbans between two adjacent workstations in a JIT system
1991,
Wang Hsu Pin
Just-in-Time (JIT) production is a philosophy that calls for reducing work-in-process...
Asymptotic behavior of random discrete event systems
1990,
Olsder G.J.
In this paper the authors discuss some aspects of the asymptotic behavior of Discrete...
Optimal prices of a job shop with a single work station: A discrete time model
1991,
Johansen Soren Glud
The topic is the optimal control of input to a discrete-time FIFO job shop with a...
Generic bill-of-material: A new product model
1991,
Hegge H.M.H.
The supply of industrial products to the market has increased fast in the last decade....
Master production scheduling: A function based approach
1991,
Giesberts Paul M.J.
The Master Production Scheduling (MPS) function has grown from an MRP-driver to a...
Some efficient multi-heuristic procedures for resource-constrained project scheduling
1990,
Boctor Fayez F.
Various heuristic procedures have been proposed to solve the well known NP-hard,...
Project bidding under deterministic and probabilistic activity durations
1990,
Elmaghraby Saleh E.
A bid for a project involves the projection into the future of several entitites which...
On strongly polynomial variants of the network simplex algorithm for the maximum flow problem
1991,
Goldfarb Donald
The authors give a short proof that the network simplex algorithm with either the...
Special features of precedence network charts
1990,
Harhalakis George
A special feature in both arrow and precedence network diagrams is that of hammock...
Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
1990,
Talbot F. Brian
In this paper computational results are presented with a very general, yet powerful...
A heuristic for multi-project scheduling with limited resources in the housing industry
1990,
Deckro Richard F.
A heuristic scheduling and control model is developed for the multi-project, resource...
The scheduling of activities to maximize the net present value of projects
1990,
Elmaghraby Salah E.
The authors review and critique the approaches offered for the resolution of the...
A multi-stage non-deterministic model for project scheduling under resources constraints
1990,
Valadares Tavares L.
Nowadays the general purpose of project scheduling is the development of decision-aids...
Introduction to computation and learning in artificial neural networks
1990,
Msson Egill
A short historical overview of the development of artificial neural networks is given...
An evaluation of microcomputer-based software packages for project management
1990,
DeWit Jan
A wide variety of commercialized project management software packages for personal...
Project compression: A method for speeding up resource constrained projects which preserve the activity schedule
1990,
Ritchie Eric
When projects start to overrun, control actions are necessary. For resource...
Bicriterion design of process control charts
1991,
Evans Gerald W.
In this paper, the authors develop a bicriterion approach to the design of process...
Quality and productivity: The linkage
1991,
Mefford Robert N.
Contrary to traditional assumptions, there does not need to be a tradeoff between...
Optimal choice and assignment of the best m of n randomly arriving items
1991,
Wilson John G.
A total of n items arrive at random. The decision maker must either select or discard...
Planning models for research and development
1990,
Zimmermann H.-J.
The importance of research and development has been increasing steadily during the...
Scheduling stochastic jobs with due dates on parallel machines
1990,
Pinedo Michael
Jobs with random processing times, random due dates, and weights are to be scheduled...
Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
1990,
Kunnathur Anand S.
This paper considers the following scheduling problem: Minimize the makespan in a...
Some efficient heuristic methods for the flow shop sequencing problem
1990,
Taillard E.
In this paper the best heuristic methods known up to now are compared to solve the...
First Page
700
701
702
703
704
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers