Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: Netherlands
Found
18376 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Note on utilizing stochastic optimal control in aggregate production planning
1993,
Love C.E.
This note summarizes research into the use of stochastic optimal control in solving...
Modelling production opportunities-An historical overview
1995,
Grubbstrm Robert W.
Production is the transformation of one set of resources into a second set. Many are...
A managerial perspective on aggregate planning
1995,
Buxey Geoff
Aggregate Planning first appeared in the literature nearly 40 years ago and has proven...
Batch-model assembly line balancing: A multiattribute decision making approach
1995,
Tabucanon Mario T.
Traditionally, assembly line balancing involves determining the number of workstations...
Application of calculus of variations to a continuous time aggregate production model
1995,
Molinder Anders
The production problem of balancing inventory and production costs in a...
Genetic algorithm for assembly line balancing
1995,
Levitin G.
Research on single-model assembly line balancing has produced several good algorithms...
The influence of lead-time reductions on decisions and rules in the production planning process
1995,
Wedel J.
This paper shows how the production planning process is affected by reductions in the...
Flexible manufacturing systems: An investigation for research and applications
1993,
Gunasekaran A.
Flexible Manufacturing Systems(s) (FMS) have already proved their great success in a...
Variable priority dispatching rules: An analytical approach
1995,
Agliari Anna
Scheduling techniques and dispatching rules are widely studied because of their...
Cutting tools versus machine tools investments in FMS design
1995,
Barad M.
Wide fluctuations in the relative investment costs in cutting tools versus machine...
Simulation analysis of just-in-time production systems
1995,
Savsar Mehmet
This paper presents the results of a simulation model developed to analyze...
Cover-Time Planning, a method for calculation of material requirements
1995,
Segerstedt Anders
This paper presents Cover-Time Planning, a method for calculation of material...
Designing customer oriented production planning system (COPPS)
1995,
Tamura Takayoshi
The paper describes a new production planning and scheduling system in which...
Resource allocation via dynamic programming in activity networks
1993,
Elmaghraby Saleh E.
The paper investigates the application of dynamic programming to the problem of...
The social psychology of project management conflict
1993,
Deckro Richard F.
Project management conflict is examined in terms of role theory. Four types of role...
A revised critical path method for networks including both overlap relationships and variable-duration activities
1993,
Leachman Robert C.
Over the years, various extensions of the Critical Path Method have been proposed that...
PERT and crashing revisited: Mathematical generalizations
1993,
Soumis Franois
The authors consider a generalization of PERT where task durations are variable and...
Hierarchical models for multi-project planning and scheduling
1993,
Speranza M. Grazia
The authors propose a model-based approach to nonpreemptive multi-project management...
Choice of the best time scale for system reliability analysis
1993,
Kordonsky Kh.B.
Several time scales (total operation time, the number of high and load operation...
Adaptive input control for job-shop type production systems with varying demands using inverse queueing network analysis
1995,
Kuroda M.
This paper describes the application of inverse queueing network analysis (IQNA) to a...
A new lower bound for the job-shop scheduling problem
1993,
Brucker Peter
A new lower bound for the job-shop scheduling problem is developed. This lower bound...
Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
1993,
Morton Thomas E.
This paper addresses the problem of scheduling multiple resource-constrained projects...
Scheduling a project to maximize its net present value: An integer programming approach
1993,
Talbot F. Brian
The authors describe an integer programming algorithm for determining scheduled start...
The two-machine flow shop problem with arbitrary precedence relations
1993,
McMahon Graham B.
The n- job 2-machine flow shop problem with arbitrary precedence constraints is...
First Page
605
606
607
608
609
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers