Cover-Time Planning, a method for calculation of material requirements

Cover-Time Planning, a method for calculation of material requirements

0.00 Avg rating0 Votes
Article ID: iaor19961162
Country: Netherlands
Volume: 41
Issue: 1/3
Start Page Number: 355
End Page Number: 376
Publication Date: Oct 1995
Journal: International Journal of Production Economics
Authors:
Abstract:

This paper presents Cover-Time Planning, a method for calculation of material requirements. Cover-Time Planning resembles MRP but it lacks its automatic time-phasing ability. Basically Cover-Time Planning is a reorder point system based on demand rates and time instead of quantities.

Reviews

Required fields are marked *. Your email address will not be published.