The influence of lead-time reductions on decisions and rules in the production planning process

The influence of lead-time reductions on decisions and rules in the production planning process

0.00 Avg rating0 Votes
Article ID: iaor19961151
Country: Netherlands
Volume: 41
Issue: 1/3
Start Page Number: 399
End Page Number: 404
Publication Date: Oct 1995
Journal: International Journal of Production Economics
Authors: ,
Abstract:

This paper shows how the production planning process is affected by reductions in the total manufacturing lead time. The paper is based on four case studies. In all four cases, lead-time information in the production planning process was not altered immediately after the actual changes in manufacturing and in the material flow had taken place. The length of the time gaps as well as the reasons for them varied from case to case.

Reviews

Required fields are marked *. Your email address will not be published.