A goal programming approach to mixed-model assembly line balancing problem
1997,
Erel Erdal
In this paper, a binary goal programming model for the mixed-model assembly line...
Capacity driven due date setting in make-to-order production systems
1997,
zdamar Linet
Due date setting is a difficult task for make-to-order companies and requires...
Integrated distribution, machine assignment and lot-sizing via Lagrangean relaxation
1997,
Vercellis Carlo
The problem of optimally coordinating and integrating complex decisions at the...
A production order quantity model with stochastic demand for a chocolate milk manufacturer
1997,
Tabucanon Mario T.
A production planning model with stochastic demand, constant defective rate and...
Sparse matrix algorithm for minimum weight design of large structures
1996,
Sarma Kamal C.
Exploiting the zeros inside the sparse global stiffness matrix of a large space...
An extended economic manufacturing quantity model for a failure prone machine with general lifetime distribution
1997,
Hong Yushin
This paper presents an economic manufacturing quantity (EMQ) model which determines an...
Lagrangian relaxation based approaches to capacitated hub-and-spoke network design problem
1994,
Aykin Turgut
The main purpose of this paper is to introduce the capacitated hub-and-spoke network...
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
1997,
Sarkar Bhaba
Previously, economic order quantity (EOQ) and economic manufacturing quantity (EMQ)...
Locating a distance-dependent facility on an undirected network with continuous link weights
1996,
Sung Chang Sup
This paper considers two problems of locating a facility on an undirected network with...
Business process re-engineering. New applications for the techniques of production engineering
1997,
MacIntosh Robert
This paper assesses the rise of business process re-engineering (BPR) as a new...
A Lagrangean heuristic for the capacitated concave minimum cost network flow problem
1994,
Larsson Torbjrn
We propose a heuristic solution technique for the capacitated concave minimum cost...
A network flow algorithm for just-in-time project scheduling
1994,
Levner E.V.
We consider a project scheduling problem with the objective being a piecewise-linear,...
Data-level parallel solution of min-cost network flow problems using ϵ-relaxations
1994,
Zenios Stavros A.
We discuss the data-parallel implementation of the ϵ-relaxation algorithm for...
The hybrid spanning tree problem
1994,
Chen Y.L.
The minimal spanning tree problem is a well-known problem in operations research. In...
The most critical path in a PERT network: A heuristic approach
1994,
Soroush H.M.
The classical PERT approach uses a deterministic critical path to estimate the...
Optimization by pattern search
1994,
Sherif Yosef S.
We develop and test an optimization algorithm written in C language. The algorithm...
A quadratically convergent global algorithm for the linearly-constrained minimum cross-entropy problem
1994,
Fang S.C.
In this paper, we propose a curved-search algorithm for solving the cross-entropy...
A global optimization algorithm based on the new filled function method and the genetic algorithm
1996,
Lee J.B.
An efficient and reliable optimization algorithm is proposed by combining the...
The Explicit Approximation Method for design optimization problems with implicit constraints
1996,
Hsu Yeh-Liang
The Explicit Approximation Method for design optimization problems with implicit...
Activity analysis: Simplifying optimal design problems through qualitative partitioning
1996,
Williams Brian C.
Activity analysis is introduced as a means to strategically cut away subspaces of a...
Polyhedral structure and properties of a model for layout design
1994,
Leung Janny
In flexible manufacturing systems, the type of materials-handling system strongly...
A column generation approach to job grouping for flexible manufacturing systems
1994,
Crama Yves
A flexible manufacturing systems consists of a number of NC-machines, linked by...
Real-time piloting of flexible manufacturing systems
1994,
Tawegoum R.
In this paper we introduce management functions in real time monitoring of FMS. We...
An algorithm for the committee construction problem
1994,
Sepil Canan
This paper presents an approach to the problem of committee construction for Associate...