Real-time piloting of flexible manufacturing systems

Real-time piloting of flexible manufacturing systems

0.00 Avg rating0 Votes
Article ID: iaor1998659
Country: Netherlands
Volume: 78
Issue: 2
Start Page Number: 252
End Page Number: 261
Publication Date: Oct 1994
Journal: European Journal of Operational Research
Authors: , ,
Keywords: control processes
Abstract:

In this paper we introduce management functions in real time monitoring of FMS. We consider FMS in which the control unit is modeled using objects Petri nets. In these systems, machine round-ups connected by complex carriage systems, particular resources behaviour and disruption appearance generate considerable data flow. The flexibility of the system is expressed at the control level by indetermisms, creating resources access conflicts and encouraging parallelism of operations. Particular resources behaviour and disruption appearance create dynamic stickings, which need real time resolution methods. We aim for autonomous decisions of the hierarchical level yielding for the minimisation of reffective delays introduced by perturbations. We propose a hierarchical level divided into three parts: a planification level, a schedule level and a real time piloting level which we will detail in the paper. As the shop floor is steadily perturbed, the piloting level must use both flexibility of machines and transport system to minimize part traveling duration. We present some fast methods able to absorb real time perturbations occurring during production, and to optimize resources management. The major difficulty is the estimation of the consequences induced by correcting actions. Thus, we look for a satisfying solution as a compromise between schedule propositions and current shop state.

Reviews

Required fields are marked *. Your email address will not be published.