Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Found
97029 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Estimation and optimization in an 1-out-of-2:G repairable dependent system
1989,
Joshi B.H.
The problems pertaining to one component system supported by an inactive standby and a repair facility are...
Preservation of some partial orderings under Poisson shock models
1989,
Singh Harshinder
Suppose each of the two devices is subjected to shocks occurring randomly as events in a Poisson process...
Maximization of availability of 1-out-of-2:G repairable dependent system
1989,
Joshi B.H.
The IFR property of the stochastic process governing a one-component system supported by an inactive...
The impact of clustered defect distributions in IC fabrication
1989,
Albin Susan L.
Whenever defect data is encountered in industrial quality control applications, the Poisson distribution...
Assessment of machine tool reliability using a proportional hazards model
1989,
Mazzuchi Thomas A.
In this article the authors present a proportional hazard model for describing machine tool failures. The...
Optimal design of accelerated life tests under periodic inspection
1989,
Yum Bong-Jin
For the exponentially distributed lifetimes, optimal accelerated life test plans are determined under the...
Optimal arrangement of components via pairwise rearrangements
1989,
Boland Philip J.
The authors introduce the notion of comparison of the criticality of two nodes in a coherent system, and...
Reliability analysis of consecutive systems-A review
1989,
Kossow A.
A system with n elements in sequence is called a consecutive- k- out-of- n:F system if it fails whenever k...
Repair limit replacement
1989,
White D.J.
Hastings introduced the concept of repair limits for replacement problems, the basic idea being that if,...
Comments on the willingness of an economic agency to pay for parallel research efforts
1989,
Mehrez Abraham
An analysis of the willingness of a risk-neutral decision-taker to pay for a parallel research strategy is...
Aggregation of resource constraints for groups of similar components in manufacturing systems
1988,
Toczylowski E.
Aggregation of resource constraints and detailed allocation decision variables in the presence of groups...
A new integer programming formulation for the permutation flowshop problem
1989,
Frieze A.M.
The authors describe a new integer programming formulation for the permutation flowshop problem in which...
Real-time scheduling of an automated manufacturing center
1989,
Raman Narayan
This paper investigates the dynamic scheduling of an automated manufacturing workcenter at which jobs are...
Scheduling jobs on a single machine with periodic release date/deadline intervals
1989,
Zdrzaka Stanisaw
The problem of scheduling jobs on a single machine with a given set of release date/deadline intervals, in...
Worst-case analysis of an approximation algorithm for flow-shop scheduling
1989,
Nowicki Eugeniusz
A worst-case analysis of an algorithm proposed by Campbell et al. for the m- machine permutation flow-shop...
Optimal scheduling with strict deadlines
1989,
Bhattacharya Partha P.
The authors consider the problem of dynamic scheduling of customers (messages) in time-critical...
A note on the minimization of mean squared deviation of completion times about a common due date
1989,
De Prabuddha
This paper points out a conceptual flaw present in a recent publication. It shows how the methodology can...
Single-machine scheduling to minimize absolute deviation of completion times from a common due date
1989,
Szwarc Wlodzimierz
The article considers a single-machine n- job scheduling problem to minimize the sum of absolute lateness...
Scheduling resources in project planning
1989,
Van Ackere Ann
When the duration of project tasks is uncertain, the timing of the availability of resources, such as...
Scheduling of a two-machine flowshop with processing time linearly dependent on job waiting-time
1989,
Goyal S.K.
This paper deals with the problem of finding the minimum finish-time schedule in a two-machine flow-shop,...
Simulating availability in a manufacturing plant
1989,
Mohanty R.P.
A simulation procedure is presented to estimate the throughput availability of a serially interconnected...
A despatching rule to allow trade-offs between inventory and customer satisfaction
1989,
Fry Timothy D.
In job-shop scheduling research, the shortest processing time despatching rule (SPT) has received...
Preemptive scheduling with staircase and piecewise linear resource availability
1989,
Werra D. de
Some variations are presented for the preemptive scheduling problem on unrelated processors, one shows how...
V-shape property of optimal sequence of jobs about a common due date on a single machine
1989,
Gupta M.C.
In this paper the authors consider an n job one machine sequencing problem in which all jobs have a common...
First Page
3966
3967
3968
3969
3970
Last Page
Papers per page:
8 Papers
16 Papers
24 Papers
32 Papers
48 Papers
Paper Filter
Search Text
Journals
Authors
Keywords
Countries
Year
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Filter It!