Found 97029 papers in total
1989,
The problems pertaining to one component system supported by an inactive standby and a repair facility are...
1989,
Suppose each of the two devices is subjected to shocks occurring randomly as events in a Poisson process...
1989,
The IFR property of the stochastic process governing a one-component system supported by an inactive...
1989,
Whenever defect data is encountered in industrial quality control applications, the Poisson distribution...
1989,
In this article the authors present a proportional hazard model for describing machine tool failures. The...
1989,
For the exponentially distributed lifetimes, optimal accelerated life test plans are determined under the...
1989,
The authors introduce the notion of comparison of the criticality of two nodes in a coherent system, and...
1989,
A system with n elements in sequence is called a consecutive- k- out-of- n:F system if it fails whenever k...
1989,
Hastings introduced the concept of repair limits for replacement problems, the basic idea being that if,...
1989,
An analysis of the willingness of a risk-neutral decision-taker to pay for a parallel research strategy is...
1988,
Aggregation of resource constraints and detailed allocation decision variables in the presence of groups...
1989,
The authors describe a new integer programming formulation for the permutation flowshop problem in which...
1989,
This paper investigates the dynamic scheduling of an automated manufacturing workcenter at which jobs are...
1989,
The problem of scheduling jobs on a single machine with a given set of release date/deadline intervals, in...
1989,
A worst-case analysis of an algorithm proposed by Campbell et al. for the m- machine permutation flow-shop...
1989,
The authors consider the problem of dynamic scheduling of customers (messages) in time-critical...
1989,
This paper points out a conceptual flaw present in a recent publication. It shows how the methodology can...
1989,
The article considers a single-machine n- job scheduling problem to minimize the sum of absolute lateness...
1989,
When the duration of project tasks is uncertain, the timing of the availability of resources, such as...
1989,
This paper deals with the problem of finding the minimum finish-time schedule in a two-machine flow-shop,...
1989,
A simulation procedure is presented to estimate the throughput availability of a serially interconnected...
1989,
In job-shop scheduling research, the shortest processing time despatching rule (SPT) has received...
1989,
Some variations are presented for the preemptive scheduling problem on unrelated processors, one shows how...
1989,
In this paper the authors consider an n job one machine sequencing problem in which all jobs have a common...