Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Found
97029 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Human factors in the implementation of just-in-time production
1990,
Oliver Nick
Based on case studies collected at two UK factories, the issues which arise during JIT implementation are...
Vendor requirements and evaluation in a just-in-time environment
1990,
Willis T. Hillman
One of the essential tasks in implementing JIT is to integrate suppliers in the overall strategy. The...
A goal approach to assembly line balancing
1990,
Deckro R.F.
A zero-one goal programming model for the assembly line balancing problem is developed. The goal model...
Maximizing the net present value of a project subject to materials and capital constraints
1987,
Smith-Daniels Vicki L.
Large projects in a variety of industries must be scheduled subject to constraints on capital availability...
Knowledge based project scheduling method for project management system of information processing system development
1989,
Oba Michiko
The main jobs in project management of an information processing system development are estimation of...
Design and performance analysis of consecutive-k-out-of-n structure
1990,
Kuo Way
A consecutive- k- out of- n : F system consists of an ordered sequence of n components such that the...
The good, the bad and the ugly: Quality on an assembly line
1990,
Thomas L. Joseph
Firms can handle defects that occur on an assembly line in a number of different ways. Traditionally,...
Quality assurance and stage dynamics in multi-stage manufacturing. Part II
1990,
Elmaghraby Salah E.
This is the second in a two-part report on control engineering considerations in quality assurance. The...
Optimal reliability choice in product design
1990,
Murthy D.N.P.
In designing new products, the reliability of the product is an important variable. Greater reliability...
A natural starting strategy for Aronson’s heuristic 1 for solving the deterministic, single operator, multiple machine, multiple run cyclic scheduling problem
1987,
Aronson Jay E.
The semiautomatic nature of machinery often makes it economical to assign more than one machine to a...
An experimental investigation of FMS scheduling rules under uncertainty
1987,
Denzler David R.
This article reports the results of an experimental investigation of scheduling decision rules for a...
Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
1987,
Flynn Barbara B.
This study investigated a procedure designed to improve performance in group technology shops. The...
The use of cost-based priorities in random and flow shops
1987,
Scudder Gary D.
This article evaluates the use of cost information for establishing priorities in a job shop. Most...
Shop floor control and priority scheduling
1987,
Putnam Arnold O.
The advent of just-in-time programs makes it necessary to look at the two subjects in the title of this...
Single machine sequencing techniques with both tardiness and flow-time criteria
1987,
Litteral Lewis A.
The performances of the best efficient sequence, contingent critical ratio, shortest processing time,...
Evaluation of scheduling techniques for solving flowshop problems with no intermediate storage
1988,
Markland Robert E.
The flowshop scheduling problem with no intermediate storage was studied in this research. This problem, a...
Load-limited order release in job shop scheduling systems
1988,
Kanet John J.
This report examines the practice of using work load limits to control the release of orders to a job...
A simulation study of processing time dispatching rules
1988,
Fry Timothy D.
In this paper, the performance of truncated variations of the shortest processing time (SI) dispatching...
Analyzing total cost for a single machine and n jobs, by use of a symmetric matrix arising from a quadratic form of service times
1989,
Alidaee Bahram
Sequencing situations are considered in which a certain number of customers have to be served by a single...
Optimal scheduling in flexible manufacturing systems
1990,
Hoppe Veronika
It is considered the embedment of n classes of elements (jobs) A i ,i∈N, to m∈1 parallel bins C...
A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings
1990,
Kim Yeong-Dae
In general job shop scheduling, n jobs have to be scheduled on m machines. The paper considers the job...
A rules-based scheduling system for flow type assembly
1990,
Copas Cathal
The scheduling system described in this paper is to be used for the short-term planning and control of...
Coordination of replenishment activities
1990,
Zoller Klaus
Extensive research on the Economic Lot Scheduling Problem (ELSP), and on related topics, has produced...
An integrated framework for generating and revising factory schedules
1990,
Ow Peng Si
Practical solutions to the production scheduling problem must provide two broad capabilities: (i) an...
First Page
3885
3886
3887
3888
3889
Last Page
Papers per page:
8 Papers
16 Papers
24 Papers
32 Papers
48 Papers
Paper Filter
Search Text
Journals
Authors
Keywords
Countries
Year
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Filter It!