Human factors in the implementation of just-in-time production

Human factors in the implementation of just-in-time production

0.00 Avg rating0 Votes
Article ID: iaor1990922
Country: United Kingdom
Volume: 10
Start Page Number: 32
End Page Number: 40
Publication Date: Aug 1990
Journal: International Journal of Operations & Production Management
Authors:
Keywords: personnel & manpower planning, production: JIT
Abstract:

Based on case studies collected at two UK factories, the issues which arise during JIT implementation are examined. These cases show that the changes involved in a move towards JIT have a political dimension. The implication is drawn that, in implementing a JIT system, production managers need to consider the strategic aspects of the change as much as they do the machines and materials aspects. An equally strategic approach to human resource management is indicated.