Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Found
97029 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Structuring modular bills of material with usage pattern analysis
1992,
Dale B.G.
This paper reports on research carried out into structuring modular bills of material in a company...
Erratum to: ‘Parkinson’s law and its implications for project management’ by Genaro J. Gutierrez and Panagiotis Kouvelis
1991,
Kouvelis Panagiotis
Please supply abstract.
PERT duration times: Mathematics or MBO?
1991,
Littlefield T.K.
The authors examine and compare the origins and mechanics of program evaluation and review technique...
Scheduling of project networks by job assignment
1991,
Drexl Andreas
A recurring problem in project management involves the allocation of scarce resources to the individual...
Reliability assessment measures based on software reliability growth model with normalized method
1991,
Osaki Shunji
It is very important to assess software reliability quantitatively by using failure time data observed...
Boolean function expansion technique to evaluate reliability and mean time to failure of a power plant
1991,
Gupta P.P.
This paper evaluates the reliability behaviour of a complex system consisting of three subsystems...
Perspectives on quality
1991,
Stewart Roger
This article aims to examine one of the basic concepts in a quality system-that of the customer-supplier...
Quasi-stationary distributions of a two-unit dependent parallel system
1991,
Pijnenburg M.
The quasi-stationary distribution of the state description process of a two unit parallel redundant system...
Industrial risk in relation to technological innovation
1990,
Rovetta Alberto
This paper deals with the analysis of the relations between the technological innovations of the last two...
Risk analysis in project evaluation
1990,
Poiaga Luigi
A big project is inserted in a three-dimensional space, in relation to variables involved: Time, Costs,...
Modelling the single-machine scheduling problem to minimise total tardiness and weighted total tardiness
1991,
Panneerselvam R.
This paper considers the problems of scheduling n independent jobs on a single-machine to minimize total...
A genetic algorithm as applied to the jobshop scheduling
1991,
Nishikawa Yoshikazu
The genetic algorithm (GA) is a method for approximate optimization simulating the process of natural...
A decomposition method for jobshop scheduling
1991,
Nishikawa Yoshikazu
In recent years, as the diversification of consumers’ demand and the progress of production...
A worst-case performance of the shortest-processing-time heuristic for single machine scheduling
1991,
Lee In-Soo
This paper analyses a worst-case performance of the shortest-processing-time (SPT) heuristic in minimizing...
Solvable cases of the no-wait flow-shop scheduling problem
1991,
Van der Veen Jack A.A.
The no-wait flow-shop scheduling program (NWFSSP) with a makespan objective function is considered. As is...
Proof of a conjecture of Schrage about the completion time variance problem
1991,
Hall Nicholas G.
The problem of minimizing the completion time variance of n jobs on a single machine has been studied by...
A two-tier hierarchical scheduler for the micro-electronic industry
1991,
Dar-El Ezey M.
This paper describes a scheduling methodology operating on a two-tier hierarchical scheduling level-the...
Conveyor scheduling system for a feeds manufacturing plant: A case study
1991,
Del Rosario Elise A.
A feeds manufacturing plant produces various feed types, each of which requires as many as 12 major...
Bicriterion scheduling problem in a job shop with parallel processors
1991,
Tabucanon Mario T.
This paper deals with the problem of bicriterion scheduling with parallel identical machines. An algorithm...
A heuristic algorithm to schedule work in the repair industry
1991,
Jhaver Sameer, C.
The application of flow shop sequencing to a flow shop generated by organization of a repair shop into...
On scheduling parallel machines with two setup classes
1991,
Rajgopal Jayant
The authors examine the problem of scheduling jobs at a bank of parallel identical machines where each job...
The minimum common-cycle algorithm for cyclic scheduling of two material handling hoists with time window constraints
1991,
Lei Lei
The problem of cyclic scheduling of two hoists is defined as follows. There are N+1 workstations, S 0...
Eureka: A hybrid system for assembly line balancing
1992,
Hoffmann Thomas R.
Numerous methods have been proposed for solution of the simple assembly line balancing (SALB) problem....
New bounds for the identical parallel processor weighted flow time problem
1992,
Webster Scott
In 1964, Eastman, Even, and Isaacs (EEI) presented a polynomial time lower bound for the NP-hard problem...
First Page
3740
3741
3742
3743
3744
Last Page
Papers per page:
8 Papers
16 Papers
24 Papers
32 Papers
48 Papers
Paper Filter
Search Text
Journals
Authors
Keywords
Countries
Year
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Filter It!