Article ID: | iaor19921332 |
Country: | United Kingdom |
Volume: | 29 |
Issue: | 12 |
Start Page Number: | 2393 |
End Page Number: | 2405 |
Publication Date: | Dec 1991 |
Journal: | International Journal of Production Research |
Authors: | Jhaver Sameer, C., Foote Bobbie L. |
Keywords: | maintenance, repair & replacement, heuristics |
The application of flow shop sequencing to a flow shop generated by organization of a repair shop into modular repair centres is investigated. Such an organization in the repair industry generates processing plans with many zero processing times. The Nawaz, Enscore and Ham (NEH) heuristic is shown to give superior schedules according to