Estimating overall equipment effectiveness for continuous production lines: with a case study in Esfahan Steel Company

Estimating overall equipment effectiveness for continuous production lines: with a case study in Esfahan Steel Company

0.00 Avg rating0 Votes
Article ID: iaor201526822
Volume: 21
Issue: 4
Start Page Number: 466
End Page Number: 478
Publication Date: Jul 2015
Journal: International Journal of Services and Operations Management
Authors: ,
Keywords: quality & reliability
Abstract:

The aim of this study is to offer a method for estimating overall equipment effectiveness (OEE) in continuous production lines. For this purpose, the subjects of continuous production and equipments effectiveness have been integrated, and by using the number of equipments and common parameters in calculating the required number of equipments and OEE indicator, an equation has been obtained for estimating OEE. A sample of data of machines in Esfahan Steel Company has been used for investigation, which includes wastes rate, production rate, and stoppage rate. Findings indicate considerable savings and equipment utilisation can be obtained, simultaneously.

Reviews

Required fields are marked *. Your email address will not be published.