Keyword: electronics industry

Found 82 papers in total
Scheduling setup changes at bottleneck workstations in semiconductor manufacturing
2006,
This paper presents a scheduling heuristic to aid the operators in semiconductor...
A discrete adjoint variable method for printed-circuit board computer-aided design
2006,
We propose an adjoint-variable method for design sensitivity analysis of printed...
A framework to assess the economic viability of remanufacturing
2005,
Recovering products at their end-of-useful-life (EOL) from customers allows companies...
Indirect network externality effects on product attributes
2003,
Indirect network externality (INE) effect exists when the utility of a product...
A note on ‘balancing printed circuit board assembly line systems’
2005,
In a recent paper of Lapierre, S.D. et al. , the authors considered the balancing of a...
A multiobjective model for the location of capacitors in radial distribution networks
2004,
The installation of shunt capacitors in electrical distribution networks can...
A unified model incorporating yield, burn-in, and reliability
2004,
The correlated improvement in yield and reliability has been observed in the case...
A note on system-on-chip test scheduling formulation
2004,
While many different formulations of the embedded core test scheduling problem (ECTSP)...
Grouping printed circuit board assembly jobs with feeders of several types
2004,
A variant of the classical job grouping problem (JGP) in printed circuit board (PCB)...
Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
2004,
A methodology for rescheduling a semiconductor fabrication line in the presence of...
Operations planning for collect-and-place machines in printed circuit board assembly
2004,
Collect-and-place machines represent one of the most popular types of placement...
Precedence constrained travelling salesman problem arising in printed circuit board assembly
2004,
Component placement sequencing is a challenging problem that arises in automated...
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
2004,
Production scheduling is a complex task in most real manufacturing settings and...
Complexity and approximability results for slicing floorplan designs
2003,
The first stage in hierarchical approaches to floorplan design determines certain...
Guided local search for final placement in VLSI design
2003,
The design of a very large scale integration circuit consists of two main parts:...
On using tabu search for design automation of very large scale integrated systems
2003,
Tabu search is a meta-heuristic problem solving technique that, when applied...
Simulation models for robust design using location depth methods
2003,
For the cost-effective production of integrated circuits, one important aspect is the...
Heuristic production activity control model for hybrid make to order and make to stock production environment
2003,
Two distinct types of semiconductor plants in Taiwan are integrated device...
Scheduling hybrid flowshops in printed circuit board assembly lines
2002,
We treat a three-stage hybrid flowshop for the production of printed circuit boards (...
Group sequencing a printed circuit board assembly system via an expected sequence dependent set-up heuristic
2003,
In circuit board manufacturing, the production sequencing problem with sequence...
Scheduling of drilling operations in printed circuit board factory
2003,
The drilling operation of the printed circuit board is very critical and usually is a...
Multiple setup printed circuit board assembly planning using genetic algorithms
2002,
A Genetic Algorithm (GA) program is developed for simultaneously optimizing component...
Bounds for the cardinality constrained P‖Cmax problem
2001,
We consider the generalization of the classical P ‖ C max problem arising when...
Papers per page: