Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: production
Found
1978 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Maximum principle-based methods for production scheduling with partially sequence-dependent setups
1997,
Maimon O.
This paper introduces a continuous-time optimal control approach to cope with...
Production scheduling in the snack-food industry
1997,
Portougal Victor
To solve a scheduling problem in a food-processing company where production is...
Stock cutting to minimize cutting length
1996,
Chandrasekaran R.
In this paper we investigate the following problem: Given two convex shapes P in and P...
Production planning and scheduling for injection moulding of pipe fittings: A case study
1997,
Vrat Prem
The present study considers the development of a production planning and scheduling...
Component fixture positioning/sequencing for printed circuit board assembly with concurrent operations
1995,
Tirupati Devanath
This paper considers the problem of positioning component fixtures on the carriers of...
Aluminium production modeling – a nonlinear bilevel programming approach
1995,
Nicholls Miles G.
This paper develops a nonlinear bilevel programming model of an aluminium smelter that...
Green manufacturing systems: Integrated product design development
1997,
Cho Moonsoo
The terminology such as ecology, environmental problems, ecosystems, ecofactory, and...
Production analysis in different time periods: An application of data envelopment analysis
1995,
Sueyoshi Toshiyuki
This article explores a new application of Data Envelopment Analysis (DEA) for...
Capacity planning under different inspection strategies
1996,
Drezner Zvi
This paper addresses the issue of location of inspection stations along a serial...
Integrated multi-item production–inventory systems
1996,
Arreola-Risa Antonio
We study an integrated multi-item production–inventory system with stochastic...
Quick Response in manufacturer–retailer channels
1997,
Iyer Ananth V.
Quick Response (QR) is a movement in the apparel industry to shorten lead time. Under...
An effective method for solving scheduling problems with fuzzy processing times
1997,
Ohta Hiroshi
In practical scheduling situations, processing times are often unknown exactly....
A fuzzy linear programming model for production planning in coal mines
1997,
Pendharkar Parag C.
This article shows how fuzzy linear programming may be used to solve production...
The impact of defects on a process with rework
1995,
Agnihothri Saligrama R.
In this paper, we attempt to quantify the impact of defects on various system...
Maintenance optimization of a production system with buffer capacity
1995,
Vanneste S.G.
We consider a deteriorating installation, which supplies input to a subsequent...
An experimental comparison of capacity rationing models
1997,
Sridharan V.
In this paper, we evaluate two approaches to capacity rationing to manage demand in...
A two-phase model for planning the production of aluminum ingot
1995,
Bowers M.R.
This paper addresses an important scheduling problem associated with the...
Combining knowledge-based systems and simulation to solve rescheduling problems
1996,
Mertens P.
Knowledge-based systems can help to enlarge the application range for simulation....
The scheduling of economic lot sizes on volume flexible production systems
1997,
Khouja Moutaz
Previous efforts on solving the classical economic lot scheduling problem (ELSP)...
Scheduling in an automated flow shop to minimize cost: backward-meta scheduling method
1997,
Ohashi Kazumasa
Recently, computer integrated manufacturing (CIM) has become the most practical...
Observation on the economic lot scheduling problem: Theory and practice
1997,
Goyal S.K.
A comment on the history of the ‘power-of-two’ rule in the context of the...
Remarks on: ‘Some extensions of the discrete lotsizing and scheduling problem’
1997,
Brggemann Wolfgang
Salomon et al. claim the NP-completeness of different variants of the discrete...
A practical application of a multi-project scheduling heuristic
1996,
Bowers Melissa R.
This article is a review of the development and application of a multi-project...
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed
1997,
Sung Chang Sup
This paper considers a scheduling problem concerned with a flowshop composed of two...
First Page
60
61
62
63
64
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers