Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

0.00 Avg rating0 Votes
Article ID: iaor1998803
Country: Netherlands
Volume: 28
Issue: 3
Start Page Number: 231
End Page Number: 243
Publication Date: Jul 1997
Journal: Engineering Optimization
Authors: ,
Keywords: manufacturing industries, scheduling, production
Abstract:

This paper considers a scheduling problem concerned with a flowshop composed of two batch processing machines where a finite number of jobs arrive dynamically at the first machine of the flowshop. On each batch processing machine, jobs are processed in batch, and each batch is allowed to contain jobs possibly up to the maximum capacity of the associated machine. The objective is to find the optimal batching schedule which minimizes the maximum completion time of all jobs. In the analysis, several solution properties are characterized, based on which an efficient dynamic programming algorithm is developed.

Reviews

Required fields are marked *. Your email address will not be published.