Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: heuristics
Found
5460 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
The solution for multi-objective flexible job shop scheduling based on genetic algorithm
2006,
Chen Huaping
This paper provides a meaningful comprehensive goal for the flexible job shop...
Heuristic for a new multiobjective scheduling problem
2007,
Miettinen Kaisa
We consider a telecommunication problem in which the objective is to schedule data...
Metaheuristics based on Bin Packing for the line balancing problem
2007,
Gourgand Michel
The line balancing problem consists in assigning tasks to stations in order to respect...
Analysis of heuristic algorithm for the flexible flow shop weighted completion time scheduling problem
2006,
Gu Chunsheng
By using single machine relaxation, we have proved that, even for the flexible flow...
Supply chain coordination through effective multi-stage inventory linkages in a JIT environment
2007,
Banerjee Avijit
We develop a mathematical model, with the objective of cost minimization, for...
A solution method for a two-dispatch delivery problem with stochastic customers
2007,
Cheung Raymond K.
We study a vehicle routing problem in which vehicles are dispatched multiple times a...
Heuristic for vehicle routing problem with perishable product delivery
2007,
Lee Young Hoon
The purpose of Vehicle Routing Problem (VRP) is to design the least costly (distance,...
A food distribution network problem: a case study
2007,
Sciomachen Anna
In this work, we deal with a food distribution problem that can be considered as a...
A heuristic approach to simultaneous course/student timetabling
2007,
Head Christopher
Many approaches have been taken in academic environments to address the problem of...
Forest planning using co-evolutionary cellular automata
2007,
Vertinsky Ilan
The spatial distribution of forest management activities has become increasingly...
The use of heuristic optimization in risk management of wind damage in forest planning
2007,
Pukkala Timo
In this work heuristic techniques were used with a forest growth model (SIMA),...
Decomposition strategies for large-scale continuous location–allocation problems
2006,
Hansen Pierre
The continuous location–allocation problem requires finding sites for m new...
Capacitated dynamic location problems with opening, closure and reopening of facilities
2006,
Captivo M. Eugnia
In this paper a capacitated dynamic location problem with opening, closure and...
Solving the continuous space p-centre problem: planning application issues
2006,
Murray Alan T.
The Voronoi diagram heuristic has been proposed for solving the p-centre problem in...
Planning machine maintenance in two-machine shop scheduling
2006,
Strusevich V.A.
We consider the two-machine open shop and two-machine flow shop scheduling problems in...
Capacitated multi-item lot-sizing problems with time windows
2006,
Dauzre-Prs Stphane
This research concerns a new family of capacitated multi-item lot-sizing problems,...
Reliable due-date setting in a capacitated make-to-order system with two customer classes
2007,
Tayur Sridhar
We study a finite-horizon discrete-time model of due-date setting (equivalently,...
Knowledge integration using problem spaces: A study in resource-constrained project scheduling
2006,
Padman Rema
The need to develop schedules for projects with resource constraints and cash flows...
Lot-sizing scheduling with batch setup times
2006,
Ye Yinyu
This paper is concerned with scheduling independent jobs on m parallel machines in...
Single machine batch scheduling problem with family setup times and release dates to minimize makespan
2006,
Cheng T.C.E.
In this paper we consider the single machine batch scheduling problem with family...
Two-machine flow shop problems with a single server
2006,
Lim Andrew
Scheduling models that allow the handling of pre-operational setup have been a source...
The Multiple-Family economic lot scheduling problem with safety stocks
2006,
Flowers A. Dale
The multiple-family economic lot scheduling problem with safety stocks (MFELSP-SS)...
Order assignment and scheduling in a supply chain
2006,
Chen Zhi-Long
We consider the supply chain of a manufacturer who produces time-sensitive products...
Optimizing service parts inventory in a multiechelon, multi-item supply chain with time-based customer service-level agreements
2007,
Jackson Peter L.
In the realm of service parts management, customer relationships are often established...
First Page
105
106
107
108
109
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers