Journal: International Journal of Project Management

Found 158 papers in total
Why risk efficiency is a key aspect of best practice projects
2004,
This paper explains what ‘risk efficiency’ means, why it is a key part of...
Fuzzy Multiple Criteria Decision Making approach for planning and design tenders selection in public office buildings
2004,
This paper presents a fuzzy multi-criteria analysis approach for selecting of planning...
A neural network approach for early cost estimation of structural systems of buildings
2004,
The importance of decision making in cost estimation for building design processes...
Project risk management in the Queensland engineering construction industry: a survey
2004,
This paper provides the results of a survey of senior management involved in the...
Risk management in the Lusoponte concession – a case study of the two bridges in Lisbon, Portugal
2004,
The case study of Lusoponte illustrates the concession awarded by the Portuguese...
Managing multi-project environments through constant work-in-process
2003,
This paper proposes new project control mechanisms that limit the number of active...
Assessing extension of time delays on major projects
2003,
This paper describes the standard methods currently available for assessing Extension...
Transforming project risk management into project uncertainty management
2003,
This paper argues that all current project risk management processes induce a...
Monitoring systems and their effectiveness for project cost control in construction
2003,
This paper reports on a research to investigate the effectiveness of some commonly...
Project scheduling for collaborative product development using a design structure matrix
2003,
New Product Development (NDP) is an important and complex business process. It...
Note on the paper ‘Resource-constrained project management using enhanced theory of constraint’ by Wei et al
2003,
In a recent paper Wei, Liu and Tsai (IAOR No. 82327) present an ‘advanced TOC...
Integrating system analysis and project management tools
2002,
Currently, computer-aided tools for system analysis are distinct from project...
Selecting the appropriate project delivery method using the analytic hierarchy process
2002,
A model using the analytical hierarchy process (AHP) is developed to select the most...
A comparative morphologic analysis of benchmark sets of project networks
2002,
The performance of methods to manage projects depends heavily on the features of their...
Resource-constrained project management using enhanced theory of constraint
2002,
One of the vital problems in the project management is the determination of the...
Model on cash flow forecasting and risk analysis for contracting firms
2002,
When a construction project is in progress, it would be beneficial to the contractor...
A risk register database system to aid the management of project risk
2002,
This paper presents a Risk Register Database System, which incorporates a Risk...
Factors and procedures used in matching project managers to construction projects in Bangkok
2002,
A number of factors and associated sub-factors influencing the matching of project...
Using systems dynamics to better understand change and rework in construction project management systems
2002,
The management of construction is complex enough without changes (e.g. to...
Integrating supply chain and critical chain concepts in engineer–procure–construct projects
2002,
The present practice of Engineer–Procure–Construct (EPC) projects in the...
Effects of resource management regimes on project schedule
2002,
This paper deals with the problem of resource scheduling within given resource...
Non-structural fuzzy decision support system for evaluation of construction safety management system
2002,
Because of the poor safety records, there have been a number of safety improvement...
A simulation model for multi-project resource allocation
2002,
There are limited solution techniques available for resource constrained single...
Project management applications of the theory of constraints beyond critical chain scheduling
2002,
The application of the Theory of Constraints (TOC) is an approach that can be used to...
Papers per page: