Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Research
Found
2417 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
2003,
Ben-Daya Mohamed
We develop multistage log-sizing models for imperfect production processes. The effect...
Observations on the interactions among deadlock avoidance policies and dispatching rules in automated manufacturing systems
2003,
Aytug Haldun
In automated manufacturing systems, deadlock avoidance policies guarantee...
Practical considerations in the optimisation of flow production systems
2003,
Tempelmeier Horst
In this paper we consider the problems faced by an industrial planner who is...
Modelling and diagnosis of feedback-controlled processes using dynamic principal components analysis and neural networks
2003,
Tsung Fugee
Statistical Process Control (SPC) and Engineering Process Control (EPC) have evolved...
Workforce planning and allocation for mid-volume truck manufacturing: A case study
2003,
Hartl R.F.
A case study for the short-term workforce planning and allocation for labour-intensive...
Manufacturing productivity improvement using effectiveness metrics and simulation analysis
2003,
Shi J.
Traditional productivity metrics, such as throughput and utilization rate, are not...
Genetic algorithm-based integrated approach to flexible manufacturing system part type selection and machine-loading problem
2002,
Wu Zhiming
Part type selection and machine loading are two interrelated subproblems in production...
Multiproduct Kanban-like control systems
2002,
Dallery Yves
Kanban Control Systems are widely used to control the release of parts in multistage...
Simulation-based comparison of push and pull systems in a job-shop environment considering the context of just in time implementation
2003,
Li Jing-Wen
An investigation of the effects of adopting a pull system in a job-shop environment in...
Estimating quality costs in an automotive stamping plant through the use of simulation
2002,
Ruyter A.S. De
The pressures of modern manufacturing require that the quality–cost benefits are...
Alternative graph formulation for solving complex factory-scheduling problems
2002,
Pacciarelli Dario
The adaptation of the academic job shop scheduling model to industrial practice is...
Robust scheduling in an advanced planning and scheduling environment
2002,
Kuroda M.
A new scheduling problem that appears in an advanced planning and scheduling (APS)...
Agent-based scheduling in production systems
2002,
Dang T.-Tung
The object in a flexible manufacturing system is optimal system resources scheduling....
Integrated material planning and operations scheduling
2002,
Fallah H.
This paper presents an Integrated approach for Material Planning and finite Operations...
Scheduling production tasks in a two-stage flexible manufacturing system
2002,
Blazewicz Jacek
The paper is concerned with construction of a heuristic algorithm for an existing...
Sequencing a hybrid two-stage flowshop with dedicated machines
2002,
Artiba Abdelhakim
We treat the n -job, two-stage hybrid flowshop problem with one machine in the first...
Stability of Johnson's schedule with respect to limited machine availability
2002,
Schmidt G.
The paper deals with the scheduling problem of minimizing the makespan in the...
Linguistic-based meta-heuristic optimisation model for flexible job shop scheduling
2002,
Baykasolu Adl
In this paper, a linguistic based meta-heuristic modelling and solution approach for...
Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
2002,
Grabot B.
Within companies, production is directly concerned with the manufacturing schedule,...
Hybrid GA and SA dynamic set-up planning optimisation
2002,
Nee A.Y.C.
Set-up planning is used to determine the set-up of a workpiece with a certain...
Integrated job release and shop-floor scheduling to minimize work in process and meet due-dates
2003,
Hodgson T.J.
We address the problem of releasing jobs to the factory floor while meeting delivery...
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
2003,
Leisten Rainer
The polynomial heuristic of Nawaz/Enscore/Ham (NEH) is one of the best heuristics to...
Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
2003,
Narendran T.T.
A key operational issue in cellular manufacturing systems is the scheduling of jobs...
Timing constraints' optimisation of reserved tasks in the distributed shop-floor scheduling
2003,
Lee Sanghoon
This paper addresses timing constraints' optimization for tasks in a single resource...
First Page
35
36
37
38
39
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers