Agent-based scheduling in production systems

Agent-based scheduling in production systems

0.00 Avg rating0 Votes
Article ID: iaor20032780
Country: United Kingdom
Volume: 40
Issue: 15
Start Page Number: 3669
End Page Number: 3679
Publication Date: Jan 2002
Journal: International Journal of Production Research
Authors: ,
Keywords: multi-agent systems
Abstract:

The object in a flexible manufacturing system is optimal system resources scheduling. The production scheduling of such a system may be resolved by a set of individual agents, who can work in parallel and their coordination may bring a more effective way of finding an optimal solution. The criteria for the optimal solution may be created on a time or economical (cost) basis but each may have a different priority depending on each situation. In this paper, we will analyse an approach to find a feasible schedule of all products, which could minimize costs and satisfy all constraints related to each product.

Reviews

Required fields are marked *. Your email address will not be published.