Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: Netherlands
Found
18376 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Capacity management: Pricing strategy, performance and the role of information
1995,
Ackere Ann van
A queueing model is used to analyse the interrelation between system performance,...
An efficient heuristic approach to the scheduling of jobs in a flowshop
1992,
Chaudhuri Dipak
Three heuristic algorithms for flowshop scheduling with the objective of minimizing...
Fuzzy job sequencing for a flow shop
1992,
Lee E. Stanley
In job sequencing for a flow shop, processing times are frequently not known exactly...
Single machine scheduling with coefficient of variation minimization
1992,
Raghavachari M.
The problem of scheduling n jobs on a single machine so as to minimize the coefficinet...
A heuristic for machine scheduling at general mail facilities
1992,
Bard Jonathan F.
In most major population centers mail collected during the day and mail arriving from...
License class design: Complexity and algorithms
1992,
Kroon Leo G.
In this paper a generalization of the Fixed Job Scheduling Problem is considered,...
The CON due-date determination method with processing time-dependent lateness penalties
1995,
Adamopoulos G.I.
In this paper the problem of scheduling jobs in a single machine using the CON method...
Proportional lotsizing and scheduling
1995,
Drexl Andreas
Two multi-item capacitated dynamic lotsizing and scheduling models with a finite...
Industrial job-shop scheduling with random operations and different priorities
1995,
Golenko-Ginzburg Minitri
A classical job-shop scheduling problem with n jobs (orders) and m machines is...
An efficient approach for large scale project planning based on fuzzy Delphi method
1995,
Gen Mitsuo
The goal of this paper is to replace probabilistic or deterministic considerations in...
A possibilistc linear program is equivalent to a stochastic linear program in a special case
1995,
Sakawa Masatoshi
In this paper, the authors discuss an equivalent condition between a possibilistic...
PROBO: An interactive system in fuzzy linear programming
1995,
Verdegay J.L.
This paper presents the analysis and design of an interactive decision support system...
Finding maximum matching for bipartite graphs in parallel
1994,
Chaudhuri Pranay
This paper shows that the maximum matching problem on bipartite graphs can be solved...
Reliability analysis of a simple replicated and-fork/and-join graph
1994,
Jan Rong-Hong
In this paper, the authors consider the problem of calculating the reliability of the...
Using local adaptations to reconfigure a spanning tree of a network
1995,
Pruhs Kirk R.
The paper defines the notion of a local adaptation of a spanning tree in a biconnected...
The Hamiltonicity of directed σ-τ Cayley graphs (Or: A tale of backtracking)
1995,
Ruskey Frank
Let τ be the 2-cycle (12) and σ the n- cycle (12ëëë n). These...
An algorithm for storage device selection and file assignment
1992,
Han Bernard T.
Newly available write-once/read-many (WORM) optical storage devices provide the...
Covering with latin transversals
1995,
Spencer Joel
Given an n×n matrix A=[a ij ], a transversal of A is a set of elements, one from...
STravel time models in automated storage/retrieval systems: A critical review
1995,
Sarker Bhaba R.
This paper presents a brief, critical review and a comparative study of some design...
Sensitivity analysis for Horn formulae
1992,
Schoen Fabio
In this paper an analysis is carried out on the connections between Horn...
Network reduction for the acyclic constrained shortest path problem
1992,
Hassan Mohsen M.D.
This paper presents a procedure for reducing networks used with the constrained...
A note on single-processor scheduling with time-dependent execution times
1995,
Chen Zhi-Long
The paper considers a single-processor scheduling model where the execution time of a...
An improved dynamic programming algorithm for the single-machine mean absolute deviation problem with a restrictive common due date
1995,
Ventura Jose A.
In 1991, Hall et al showed that the problem of minimizing the mean earliness and...
A logic approach to the resolution of constraints in timetabling
1992,
Kang Le
The construction of timetables involving three or more variables taking values from...
First Page
612
613
614
615
616
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers