Article ID: | iaor1996850 |
Country: | Netherlands |
Volume: | 40 |
Issue: | 1 |
Start Page Number: | 29 |
End Page Number: | 36 |
Publication Date: | Jun 1995 |
Journal: | International Journal of Production Economics |
Authors: | Adamopoulos G.I., Pappis C.P. |
In this paper the problem of scheduling jobs in a single machine using the CON method is considered. The objective function is the total weighted lateness with different penalties, allocated to early and tardy jobs. Four algorithms are developed for the solution, examples are given on some relevant lemmas are shown.