Country: South Korea

Found 896 papers in total
A branch and bound algorithm for solving a capacitated subtree of a tree problem in local access telecommunication networks
1997,
Given a rooted tree T with node profits and node demands, the capacitated subtree of a...
A study on solution methods of two-stage stochastic LP problems
1997,
In this paper, we have proposed new solution methods to solve TSLP (two-stage...
A stochastic linear programming model for a multi-stage production system with random yields
1997,
In this paper, we propose a stochastic LP model for determining an optimal input...
An O(n2logn) algorithm for the linear knapsack problem with SUB and extended GUB constraints
1997,
We present an extension of the well-known generalized upper bound (GUB) constraint and...
Development of clustering algorithm for the design of telecommunication network considering cost–traffic tradeoff
1997,
In the design of telecommunication network, the network configuration using hubbing...
Closed queueing networks and zeros of successive derivative
1997,
Consider a Jackson type closed queueing network in which each queue has a single...
A Markovian queue with serial servers and its application to the double tollbooth system
1997,
We consider an M/M/2 queue with two servers placed in series. System performance...
Two queue single server model for the DQDB metropolitan area network
1997,
This paper presents an approximate analytical model to estimate the mean packet...
A queueing model for traffic control in leaky bucket system
1997,
We build a queueing model for buffered leaky bucket system. First, we set up the...
Some theoretical results on the algorithm for the tree-like queueing networks with blocking
1997,
Recently Lee et al . developed an approximation algorithm for the performance...
The probability distribution of the number of customers accumulated when a vacation ends in the Geo/G/1 gated system
1997,
We present a procedure which finds the probability distribution of number of customers...
Performance evaluation of ATM nodes by importance sampling simulation
1997,
The cell loss probability recommended in the B-ISDN is in the range of 10 –8...
The advantageous bargaining sequence in sequential bargaining with multiple parties
1997,
In this paper, we study a bargaining order problem where one buyer sequentially...
The confirmation of the validity and reliability of the UIS model toward the Public Management Information System
1997,
The structure and dimensionality of the User Information Satisfaction (UIS) construct...
Research on factors influencing adoption of EDI in Korean companies
1997,
This study is to establish the validity of EDI adoption model in Korean companies. The...
An AI approach with tabu search to solve multi-level knapsack problems using cycle detection, short-term and long-term memory
1997,
An AI approach with tabu search is designed to solve multi-level knapsack problems....
Design of an expert system for the optimal use of solar energy
1997,
In this research, the intensity of solar energy, which was injected to the different...
Estimating the probability of perfect preventive maintenance in the Brown–Proschan imperfect PM model
1997,
We propose a method for estimating the probability of perfect PM from successive...
An interactive fuzzy approach for multiobjective nonlinear programming problems with fuzzy parameters
1997,
In general, two types of fuzziness of human judgements should be incorporated in...
Process redesign through Dynamic Modeling
1997,
Organizational change projects such as Business Process Redesign (BPR) have been...
The worker scheduling scheme for maximum work efficiency with workloads balancing consideration
1997,
The problem addressed in this paper is to minimize the deviations of workloads...
An analysis of two-stage manufacturing systems with random processing times
1997,
This paper analyzes a system which consists of two workstations that are separated by...
Performance evaluation of closed manufacturing systems with sampling inspections
1997,
In this paper we consider closed flow line systems with sampling inspections. The...
Analysis of a production system with early set-up and post-operation
1997,
We consider a production system with post-operation and early set-up. As soon as there...
Papers per page: