Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Anders Segerstedt
Information about the author Anders Segerstedt will soon be added to the site.
Found
13 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Lean assemble‐to‐order manufacturing at Ericsson
2013
This article describes the findings and results from an improvement project concerning...
Measurements of excellence in a supply chain
2012
Organisations focus on having an excellent supply chain to increase net income. But...
Multi‐product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy
2012
In this research we study the multi‐product Economic Lot Scheduling Problem...
Performance measurements in supply chains within Swedish industry
2011
A critical issue for a company to gain a competitive position is to improve its supply...
A scheduling policy for adjusting economic lot quantities to a feasible solution
2007
A heuristic scheduling policy is introduced for a multi-item, single-machine...
Corrections of costs to feasible solutions of economic lot scheduling problems
2008
The paper considers the problem of choosing order quantities and a cyclic production...
A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique
2007
In this paper, a heuristic method is presented which gives a novel approach to solve...
Inventory control with a modified Croston procedure and Erlang distribution
2004
This paper considers an inventory control system, primarily for a finished goods...
Frequency approach for treating capacity-constrained multilevel production
2004
An idea about how to tackle and solve the difficult problem of determining economic...
Lot sizes in a capacity constrained facility with available initial inventories
1999
This paper presents an heuristic method for deciding what items and what order sizes...
A capacity-constrained multi-level inventory and production control problem
1996
This paper presents a mathematical formulation of a capacity constrained multistage...
Formulas of MPR
1996
This paper presents MRP in formulas. The usual presentations of the MRP-calculation in...
Cover-Time Planning, a method for calculation of material requirements
1995
This paper presents Cover-Time Planning, a method for calculation of material...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers