| Article ID: | iaor19971303 |
| Country: | Netherlands |
| Volume: | 45 |
| Issue: | 1/3 |
| Start Page Number: | 449 |
| End Page Number: | 461 |
| Publication Date: | Aug 1996 |
| Journal: | International Journal of Production Economics |
| Authors: | Segerstedt Anders |
| Keywords: | inventory |
This paper presents a mathematical formulation of a capacity constrained multistage inventory and production control problem. It argues that most practical multistage inventory and production control problems can be summarised in the formulation. The model has a strong connection to the model of Billington, McClain and Thomas and is also inspired of a paper from Bard and Golany. The revised Billington/McClain/Thomas model is formulated in a dynamic programming recursion. A numerical solution to a simple problem is presented. A scheduling problem concerning capacity constrained models are enlightened. Further, the paper points to differences and relationships between this capacity constrained model, MRP, Kanban and Cover-Time Planning.