A flood wave disaster recovery model for under construction dam projects: findings from Greece

A flood wave disaster recovery model for under construction dam projects: findings from Greece

0.00 Avg rating0 Votes
Article ID: iaor20162756
Volume: 19
Issue: 3
Start Page Number: 240
End Page Number: 255
Publication Date: Jun 2016
Journal: International Journal of Risk Assessment and Management
Authors:
Keywords: risk, design
Abstract:

Dam design and construction teams respect flood wave risks, they perform estimations and define response plans for the project post‐completion period. To this end, dams are designed strongly enough to overcome such a disaster. The aim of this paper is to investigate whether a flood wave danger exists during the pre‐completion period of a dam project and how a project manager can respond on the occurrence of such a crisis event. In order to answer both these questions, a panel of Greek experts justify this risk and validate a corresponding disaster‐recovery model. This model was extracted from literature findings and aligns to international project management standards.

Reviews

Required fields are marked *. Your email address will not be published.