The resource-constrained activity insertion problem with minimum and maximum time lags

The resource-constrained activity insertion problem with minimum and maximum time lags

0.00 Avg rating0 Votes
Article ID: iaor200971291
Country: United Kingdom
Volume: 12
Issue: 5
Start Page Number: 447
End Page Number: 460
Publication Date: Oct 2009
Journal: Journal of Scheduling
Authors: ,
Abstract:

This paper considers the resource-constrained activity insertion problem with minimum and maximum time lags. The problem involves inserting a single activity in a partial schedule while preserving its structure represented through resource flow networks and minimizing the makespan increase caused by the insertion. In the general case, we show that finding a feasible insertion that minimizes the project duration is NP-hard. When only minimum time lags are considered and when activity durations are strictly positive, we show that the problem is polynomially solvable, generalizing previously established results on activity insertion for the standard resource-constrained project scheduling problem.

Reviews

Required fields are marked *. Your email address will not be published.