Artigues Christian

Christian Artigues

Information about the author Christian Artigues will soon be added to the site.
Found 18 papers in total
Line search method for solving a non-preemptive strictly periodic scheduling problem
2016
We study a non‐preemptive strictly periodic scheduling problem. This problem...
A railroad maintenance problem solved with a cut and column generation matheuristic
2015
In this article, we address a real life optimization problem, the rail track...
A note on ‘event‐based MILP models for resource‐constrained project scheduling problems’
2013
Recently, new mixed integer linear programming formulations for the...
Fast minimum float computation in activity networks under interval uncertainty
2013
This paper concerns project scheduling under uncertainty. The project is modeled as an...
A Memetic Algorithm with a large neighborhood crossover operator for the Generalized Traveling Salesman Problem
2010
The Generalized Traveling Salesman Problem (GTSP) is a generalization of the...
Frequency allocation problem in a SDMA satellite communication system
2011
Spatial Division Multiple Access (SDMA) is a principle of radio resource sharing that...
Optimization of occupancy rate in dial‐a‐ride problems via linear fractional column generation
2011
In this paper, we consider a dial‐a‐ride problem where the objective is...
An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport
2010
Operations management of subway systems is associated with combinatorial optimization...
The resource-constrained activity insertion problem with minimum and maximum time lags
2009
This paper considers the resource-constrained activity insertion problem with minimum...
Models and methods for frequency assignment with cumulative interference constraints
2008
In this paper, a realistic modeling of interferences for frequency assignment in...
A branch and bound method for the job-shop problem with sequence-dependent setup times
2008
This paper deals with the job-shop scheduling problem with sequence-dependent setup...
Constraint-propagation-based cutting planes: an application to the resource-constrained project scheduling problem
2005
We propose a cooperation method between constraint programming and integer programming...
Maximization of solution flexibility for robust shop scheduling
2005
We consider the problem of introducing flexibility in the schedule determination phase...
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis
2005
We consider the job-shop problem with sequence-dependent setup times. We focus on the...
Solving the resource-constrained project scheduling problem with large neighbourhood search
2004
This paper presents the Local Search with Subproblem Exact Resolution (LSSPER) method...
Insertion techniques for static and dynamic resource-constrained project scheduling
2003
A flow network model is presented for the static resource-constrained project...
A Petri net model and a general method for on- and off-line multi-resource shop floor scheduling with setup times
2001
This paper presents a Petri net model in the framework of a general method for on-line...
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
2000
In this paper, a polynomial activity insertion algorithm in a multi-resource schedule...
Papers per page: