Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time

Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time

0.00 Avg rating0 Votes
Article ID: iaor200968987
Country: United Kingdom
Volume: 60
Issue: 7
Start Page Number: 921
End Page Number: 933
Publication Date: Jul 2009
Journal: Journal of the Operational Research Society
Authors: , ,
Keywords: scheduling, vehicle routing & scheduling
Abstract:

The liquid crystal display module scheduling problem (LCMSP) is a variation of the classical parallel machines scheduling problem, which has many real-world applications, particular, in the thin film transistor liquid crystal display (TFT-LCD) manufacturing industry. In this paper, we present a case study on the LCMSP, which is taken from a final liquid crystal display module (LCM) shop floor in a TFT-LCD industry. For the case we investigated, the jobs are clustered by their product types and the machine setup time is sequentially dependent on the product types of the jobs processed on the machine. In LCMSP, the objective is to maximize the total profit subject to fulfilling contracted quantities without violating the due date and machine capacity restrictions. The LCMSP can be modelled as a multi-level optimization problem. The sub-problem of LCMSP can be transformed into the vehicle routing problem with time window (VRPTW). One can therefore solve the LCMSP efficiently using existing VRPTW algorithms. We present two new algorithms based on the savings algorithms with some modifications to accommodate the LCMSP. Based on the characteristics of the LCM process, a set of test problems is generated covering most of the real-world applications for test purposes. Computational results and performance comparisons show that the proposed algorithms solved the LCMSP efficiently and near-optimally.

Reviews

Required fields are marked *. Your email address will not be published.