Solution strategies for multi-stage wafer probing scheduling problem with reentry

Solution strategies for multi-stage wafer probing scheduling problem with reentry

0.00 Avg rating0 Votes
Article ID: iaor20091004
Country: United Kingdom
Volume: 59
Issue: 5
Start Page Number: 637
End Page Number: 651
Publication Date: May 2008
Journal: Journal of the Operational Research Society
Authors: , , ,
Abstract:

The multi-stage wafer probing scheduling problem (M-WPSP) with reentry is a practical variation of the parallel-machine scheduling problem. Since the M-WPSP involves multiple product families, to be processed on multiple stages, with various job due dates, ready times, reentry, serial and batch operations, sequential-dependent setup time, it is more difficult to solve than the classical parallel-machine scheduling problems. In this paper, we consider two strategies to solve the M-WPSP with reentry, where the total machine workload must be minimized. These two strategies incorporate a global planning mechanism, in advance, to determine the required stage due date of job at each process stage to prevent the due date problems occurring at the final stage. The sequential strategy schedules the jobs at the required stages according to the sequence of manufacturing process. The parallel strategy is designed specifically for the reentrant characteristic.

Reviews

Required fields are marked *. Your email address will not be published.