Pearn W.L.

W.L. Pearn

Information about the author W.L. Pearn will soon be added to the site.
Found 21 papers in total
Solution strategies for multi-stage wafer probing scheduling problem with reentry
2008
The multi-stage wafer probing scheduling problem (M-WPSP) with reentry is a practical...
Production quality and yield assurance for processes with multiple independent characteristics
2006
Process capability indices have been widely used in the manufacturing industry...
Optimal control of an M/G/1/K queueing system with combined F policy and startup time
2007
We investigate the optimal management problem of an M/G/1/K queueing system with...
Tool replacement policy for one-sided processes with low fraction defective
2007
In most manufacturing industries, tool replacement policy is essential for minimizing...
Critical acceptance values and sample sizes of a variables sampling plan for very low fraction of defectives
2006
Acceptance sampling plans are practical tools for quality control applications, which...
An effective decision making method for product acceptance
2007
Acceptance sampling plans are practical tools for quality assurance applications...
Variables sampling plans with PPM fraction of defectives and process loss consideration
2006
Acceptance sampling plans provide the vendor and the buyer decision rules for lot...
A Bayesian approach for assessing process precision based on multiple samples
2005
Using process capability indices to quantify manufacturing process precision...
Approximate solutions for the maximum benefit Chinese postman problem
2005
The Maximum Benefit Chinese Postman Problem (MBCPP) is an interesting and practical...
Analytic network process (ANP) approach for product mix planning in semiconductor fabricator
2005
This paper proposes an application of the analytic network process for the selection...
Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions
2004
In this paper, we consider the wafer probing scheduling problem (WPSP) to sequence...
Cost benefit analysis of series systems with warm standby components
2003
This paper deals with the cost benefit analysis of series systems with warm standby...
A case study on the multistage integrated circuit final testing scheduling problem with reentry
2004
The integrated-circuit final testing scheduling problem (ICFTSP) with reentry is a...
On the maximum benefit Chinese postman problem
2003
The Maximum Benefit Chinese Postman Problem (MBCPP) is a practical generalization of...
A Bayesian-like estimator of the process capability index Cpmk
2003
Pearn et al . proposed the capability index C pmk , and investigated the statistical...
Job order releasing and throughput planning for multi-priority orders in wafer fabs
2003
To meet the production target of multi-level (multiple priority rank) orders in wafer...
The wafer probing scheduling problem
2002
The wafer probing scheduling problem (WPSP) is a variation of the parallel-machine...
Improved solutions for the Chinese postman problem on mixed networks
1999
The Chinese postman problem (CPP) is that of finding the shortest postman tour...
Improved solutions for the traveling purchaser problem
1998
The traveling purchaser problem (TPP) is an interesting generalization of the...
Algorithms for the rural postman problem
1995
The rural postman problem (RPP) is a practical extension of the well-known Chinese...
Augment-insert algorithms for the capacitated arc routing problem
1991
The capacitated arc routing problem (CARP) is a generalization of the rural postman...
Papers per page: