A drum–buffer–rope scheduling method for manufacturing environments with bottleneck re-entrant flows

A drum–buffer–rope scheduling method for manufacturing environments with bottleneck re-entrant flows

0.00 Avg rating0 Votes
Article ID: iaor20062070
Country: United Kingdom
Volume: 44
Issue: 5
Start Page Number: 883
End Page Number: 902
Publication Date: Jan 2006
Journal: International Journal of Production Research
Authors: ,
Keywords: theory of constraints, drum-buffer-rope
Abstract:

Implementing the drum–buffer–rope (DBR) management system effectively increases throughput, lowers work in process (WIP), shortens cycle time, and improves on-time delivery performance. However, implementing DBR is difficult and complex in manufacturing environments with bottleneck re-entrant flows, such as semiconductor wafer manufacturing plants, IC substrate manufacturing plants, and multilayer board manufacturing plants. The lack of a drum development method for these environments is a key problem. That is, several bottleneck operations of a lot will appear on the drum in various locations. Ensuring proper sequencing of bottleneck operations and providing sufficient time between adjacent bottleneck operations of a lot requires a method in the drum development process. A drum development method for manufacturing environments with bottleneck re-entrant flows is proposed. This method can ensure the effective sequencing of bottleneck operations and provide sufficient time between adjacent bottleneck operations of a lot within a drum. In addition, a detailed exploration of the principles and algorithm in this method is presented. A numeric example and a real-life IC substrate manufacturing case are utilized to evaluate the application of the proposed method. Employing this proposed methodology will facilitate manufacturing plants with bottleneck re-entrant flows to successfully implement an effective DBR management system.

Reviews

Required fields are marked *. Your email address will not be published.