Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
H.-H. Wu
Information about the author H.-H. Wu will soon be added to the site.
Found
4 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
A capacity available-to-promise model for drum–buffer–rope systems
2008
The capacity available-to-promise (CATP) concept, which is designed to enhance the...
The study of an easy-to-use drum–buffer–rope and buffer management system
2006
The concept and advantages of the Drum–Buffer–Rope (DBR) scheduling and...
A drum–buffer–rope scheduling method for manufacturing environments with bottleneck re-entrant flows
2006
Implementing the drum–buffer–rope (DBR) management system effectively...
A new rescheduling method for computer based scheduling systems
1995
Providing a powerful interactive tool for the scheduler to quickly and easily react to...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers