General flowshop models: Job dependent capacities, job overlapping and deterioration

General flowshop models: Job dependent capacities, job overlapping and deterioration

0.00 Avg rating0 Votes
Article ID: iaor2004973
Country: United Kingdom
Volume: 9
Issue: 4
Start Page Number: 399
End Page Number: 414
Publication Date: Jul 2002
Journal: International Transactions in Operational Research
Authors: , ,
Keywords: flowshop
Abstract:

Several extensions of the two-machine flowshop model that arise in industrial applications are considered. These modifications of the classical case concern buffer capacities that vary with the size of the part, and processing times that are variable and increase in situations of overlapping and long waiting periods between the different operations.

Reviews

Required fields are marked *. Your email address will not be published.