Keyword: flowshop

Found 221 papers in total
Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
2013,
This paper considers the permutation flow shop scheduling problem with minimal and...
Polynomial time solutions for scheduling problems on a proportionate flowshop with two competing agents
2014,
In scheduling problems with two competing agents, each one of the agents has his own...
An improved FPTAS for maximizing the weighted number of just‐in‐time jobs in a two‐machine flow shop problem
2013,
Recently, Shabtay and Bensoussan (2012) developed an original exact...
Impact of varying levels of setup time on the performance of algorithms for scheduling a flow shop with sequence dependent setup time
2013,
This paper presents a comparative study of two algorithms for the flow shop scheduling...
Multi‐objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study
2013,
The permutation flowshop scheduling problem has been thoroughly studied in recent...
Outsourcing and scheduling for two‐machine ordered flow shop scheduling problems
2013,
This paper considers a two‐machine ordered flow shop problem, where each job is...
A note on the two‐stage hybrid flow shop problem with dedicated machines
2012,
In this paper we introduce a new dominance rule for the two‐stage hybrid flow...
Single machine batch scheduling with two competing agents to minimize total flowtime
2011,
We study a single machine scheduling problem, where two agents compete on the use of a...
A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem
2011,
This paper proposes a hybrid modified global‐best harmony search (hmgHS)...
Bounding strategies for the hybrid flow shop scheduling problem
2011,
In this paper, we investigate new lower and upper bounds for the...
Flow shop scheduling to minimize makespan with decreasing time‐dependent job processing times
2011,
In this study, we consider an n ‐job, m ‐machine flow shop scheduling...
A note on two‐machine no‐wait flow shop scheduling with deteriorating jobs and machine availability constraints
2011,
This paper is concerned with two‐machine no‐wait flow shop scheduling...
Outsourcing and production scheduling for a two-stage flow shop
2011,
In this paper we study the production scheduling problem for a two-stage flow shop in...
An improved algorithm for the two machine flow shop problem with several availability constraints
2010,
In this paper we deal with the two-machine flow shop scheduling problem with several...
An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
2009,
Much of the research on operations scheduling problems has either ignored setup times...
A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness
2009,
This paper presents a new heuristic for solving the flowshop scheduling problem that...
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
2009,
This paper proposes a simulated annealing-based meta-heuristic to minimise makespan in...
Batch scheduling on two-machine flowshop with machine-dependent setup times
2009,
We study a batch scheduling problem on a 2-machine flowshop. We assume unit processing...
Permutation flow shop scheduling with earliness and tardiness penalties
2009,
We consider the permutation flow shop scheduling problem with earliness and tardiness...
New heuristics for flow shop problem to minimize makespan
2010,
This paper investigates the flow shop problem with the objective to minimize makespan....
Throughput optimization in two-machine flowshops with flexible operations
2010,
In this study, a two-machine flowshop producing identical parts is considered. Each of...
Permutation flow shops with exact time lags to minimise maximum lateness
2009,
In this paper we investigate the m-machine permutation flow shop scheduling problem...
Special cases on two machine flow shop scheduling with weighted WIP (work-in-progress) costs
2009,
In this paper, we consider a relatively new two-machine flow shop scheduling problem...
Reliability centered multi objective hybrid flow shop scheduling
2009,
Real world scheduling problems are complex in nature. They require satisfying multiple...
Papers per page: