Article ID: | iaor20021124 |
Country: | United Kingdom |
Volume: | 8 |
Issue: | 2 |
Start Page Number: | 139 |
End Page Number: | 153 |
Publication Date: | Mar 2001 |
Journal: | International Transactions in Operational Research |
Authors: | Co Henry C., Goh Mark, Sharafali Moosa |
This paper considers the issue of whether to mix part-types in one or several of the families to be produced in a flexible manufacturing system (FMS). For this input control problem in an FMS, we have derived conditions that support the mixing of a part-type, which can share the setup of other part-types, in deterministic environment. The problem is identified as a special economic lot scheduling problem (ELSP), and is formulated as a linear programming problem. Analytical insights are derived by considering the special case with three part-families. The results are illustrated with a numerical example.