| Article ID: | iaor20021124 | 
| Country: | United Kingdom | 
| Volume: | 8 | 
| Issue: | 2 | 
| Start Page Number: | 139 | 
| End Page Number: | 153 | 
| Publication Date: | Mar 2001 | 
| Journal: | International Transactions in Operational Research | 
| Authors: | Co Henry C., Goh Mark, Sharafali Moosa | 
This paper considers the issue of whether to mix part-types in one or several of the families to be produced in a flexible manufacturing system (FMS). For this input control problem in an FMS, we have derived conditions that support the mixing of a part-type, which can share the setup of other part-types, in deterministic environment. The problem is identified as a special economic lot scheduling problem (ELSP), and is formulated as a linear programming problem. Analytical insights are derived by considering the special case with three part-families. The results are illustrated with a numerical example.