Scheduling part-families under flexible manufacturing systems: To mix or not to mix?

Scheduling part-families under flexible manufacturing systems: To mix or not to mix?

0.00 Avg rating0 Votes
Article ID: iaor20021124
Country: United Kingdom
Volume: 8
Issue: 2
Start Page Number: 139
End Page Number: 153
Publication Date: Mar 2001
Journal: International Transactions in Operational Research
Authors: , ,
Abstract:

This paper considers the issue of whether to mix part-types in one or several of the families to be produced in a flexible manufacturing system (FMS). For this input control problem in an FMS, we have derived conditions that support the mixing of a part-type, which can share the setup of other part-types, in deterministic environment. The problem is identified as a special economic lot scheduling problem (ELSP), and is formulated as a linear programming problem. Analytical insights are derived by considering the special case with three part-families. The results are illustrated with a numerical example.

Reviews

Required fields are marked *. Your email address will not be published.