Co Henry C.

Henry C. Co

Information about the author Henry C. Co will soon be added to the site.
Found 6 papers in total
Production scheduling in a flexible manufacturing system under random demand
2004
This paper considers the problem of production scheduling in a Flexible Manufacturing...
Scheduling part-families under flexible manufacturing systems: To mix or not to mix?
2001
This paper considers the issue of whether to mix part-types in one or several of the...
Overplanning factor in Toyota's formula for computing the number of kanban
1997
To determine the number of required kanban, Toyota uses a formula based on the average...
Streamlining material flow in flexible manufacturing systems: A lesson in simplicity
1992
The flexible manufacturing system (FMS) represents an important new development in...
Age-maintenance of an M/G/1 production system
1991
Many production systems can be modelled as queueing systems. This paper examines the...
A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
1991
The ‘kanban’, which literally means ‘cards’, is an information...
Papers per page: