Can target costing and whole life costing be applied in the construction industry?: Evidence from two case studies

Can target costing and whole life costing be applied in the construction industry?: Evidence from two case studies

0.00 Avg rating0 Votes
Article ID: iaor20012354
Country: United Kingdom
Volume: 11
Issue: 4
Start Page Number: 303
End Page Number: 324
Publication Date: Dec 2000
Journal: British Journal of Management
Authors: , , , ,
Keywords: financial, engineering
Abstract:

Building on the results of a far-reaching action research project we discuss an attempt to introduce target costing in the UK construction industry. After examining some of the issues facing the UK construction industry, we examine the case for using target costing as a way of supporting supply-chain integration in view of an improvement of the level of profitability and quality of the industry. After presenting evidence from two pilot projects we propose come considerations on target costing and its applicability to the UK construction sector and derive directions for future research.

Reviews

Required fields are marked *. Your email address will not be published.