| Article ID: | iaor19991475 |
| Country: | Japan |
| Volume: | 41 |
| Issue: | 2 |
| Start Page Number: | 261 |
| End Page Number: | 278 |
| Publication Date: | Jun 1998 |
| Journal: | Journal of the Operations Research Society of Japan |
| Authors: | Nagasawa Hiroyuki, Chue Shing |
| Keywords: | scheduling, probability |
Stochastic two-objective scheduling to minimize both the expected value and the variance of total flow time is one of the most interesting subjects for shop-floor managers. This paper develops a heuristic method for generating a set of nondominated schedules to this two-objective scheduling problem in a parallel machine case, on the basis of the heuristic method proposed for a single machine case by Jung