A flow-shop manufacturing scheduling system with interactive computer graphics

A flow-shop manufacturing scheduling system with interactive computer graphics

0.00 Avg rating0 Votes
Article ID: iaor1997561
Country: United Kingdom
Volume: 16
Start Page Number: 74
End Page Number: 84
Publication Date: Oct 1996
Journal: International Journal of Operations & Production Management
Authors:
Keywords: flowshop
Abstract:

The paper describes flow-shop scheduling problems and an interactive graphical flow-shop manufacturing scheduling system developed to handle any number of jobs and machines. It outlines the methodical approach of using scheduling tools, such as lower bound, automatic generation of near-optimal system sequences and schedule optimization in which the user is guided in determining optimal sequence, to cut scheduling time and make the scheduling system flexible. Outputs are in the form of Gantt charts. The graphical capability can be a very useful tool for decision makers such as production and operations managers who often encounter many day-to-day scheduling problems and challenges.

Reviews

Required fields are marked *. Your email address will not be published.