| Article ID: | iaor1989471 |
| Country: | United States |
| Volume: | 35 |
| Issue: | 9 |
| Start Page Number: | 1079 |
| End Page Number: | 1091 |
| Publication Date: | Sep 1989 |
| Journal: | Management Science |
| Authors: | Deleersnyder Jean-Luc, Hodgson Thom J., Muller Henri, OGrady Peter J. |
| Keywords: | inventory, markov processes |
Three problem areas exist in designing and implementing a kanban controlled JIT system: the identification of flow lines problem, the flow line loading problem and the operational control problem. This paper addresses the operational control problem. A general